Similar Projects
Desilt Drainage Structures
Bidding
$85,000 est. value
FL

Desilt Box Culverts with Repairs
Bidding
$750,000 est. value

Design-Build Services for Moultrie Trails Area Drainage Improvements
Results
Less than $1,997,028 est. value
Saint Augustine, FL 32084

Dredged Material Management Area Du-2 and SJ-1 Shoreline Improvements
Results
Less than $1,467,747 est. value

Winton Circle Drainage Improvements
Bidding
FL 32086

Clean and Desilt Box Culverts
Results
Less than $250,000 est. value

Kings Road Drainage Improvements
Bidding
FL 32086

3rd Alley Ditch Drainage Improvements
Results
Saint Augustine, FL 32080

Deep Creek Conservation Area - Ditch Blocks Installation
Results
Less than $59,310 est. value
FL

Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St. Johns County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Second Call - Halfmile Creek Mitigation Area, Trail Road Improvements and Low Water Crossing
Results
Less than $22,000 est. value
FL

Fabrication and Installation of Removable Flood Barriers for the Waste Water Treatment Plant
Results
Saint Augustine, FL

FEMA Project - Old A1A South Berm Restoration
Results
Less than $1,152,098 est. value
FL

CDBG-DR Project: Avenue D and Tart Road Drainage Improvements
Results
Less than $680,364 est. value
Saint Augustine, FL 32084

Drainage Repair on SR 207
Results
Less than $240,000 est. value
FL

Last Updated 05/11/2020 10:35 AM
Project Title

Santa Maria Boulevard Drainage Improvements

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32084   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,173,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall be responsible for providing any and all labor, materials, equipment, and supervision required in order to construct drainage improvements along Santa Maria Boulevard, approximately 2,800 linear feet between Deltona Boulevard and Andora Street. Designed improvements include both replacement and rehabilitation of existing drainage infrastructure and piping, and ancillary work including, but not limited to, paving, grassing, and sodding.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Turf and Grasses, Sodding.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents