Similar Projects
Reported | 12/07/2018 12:00 AM |
Project Title | Asphalt Resurfacing LMIG 2018 |
Physical Address | View project details and contacts |
City, State (County) | Kingsland, GA (Camden County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Work is to include tack, striping and traffic control. 2. City of Kingsland will provide all manhole and valve extension rings to be installed by the contractor at time of paving. 3. Striping to match existing layout including R/R crossings, stop bars, crosswalks and long lines unless noted otherwise. 4. All striping is to be completed using thermosplastic with reflective beads. 5. Overlay to be 1.5 inches of .95 asphalt. | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |