Similar Projects
Edgefield Highway Waterline Relocation
Post-Bid
Aiken, SC

Water Pipeline Pigging Project
Post-Bid
Mount Pleasant, SC

Phase I Replacement of Approximately 2,500 Linear Feet of 18 Inch Wastewater Line
Results
$1,100,000 est. value
Bishopville, SC 29010

College Street Waterline Upgrades
Results
Due West, SC

Schwartz WWTP Digester Sludge Pumps
Post-Bid
SC

New Drinking Water Well 3 for Dalzell Water District
Results
$150,000 to $250,000 est. value
Sumter, SC

Utility Relocations
Post-Bid
Batesburg-Leesville, SC

2017 System Wide Small Waterline Improvements Project
Results
Williamston, SC

Decker Boulevard Pump Station Emergency Standby Pump
Post-Bid
SC

Oswego Rural Water Company Water System Expansion - South of Congruity
Results
$1,000,000 to $1,200,000 est. value
Cheraw, SC

Phase III Enoree Water and Sewer Improvements
Post-Bid
$250,000 to $300,000 est. value
Spartanburg, SC

Booster Pump Control Panel And Vfd
Results
Goose Creek, SC 29445

Water System Improvements - Lafrance Mill Village (West)
Post-Bid
Pendleton, SC

Phase II I and I Reduction Project - Wastewater Collection System I and I Rehabilitation
Results
Sullivan's Island, SC

Utility Extension
Post-Bid
Seneca, SC

Reported 02/15/2019 12:00 AM
Project Title

Clarendon County Phase 3A - Wyboo Point to Eagle Pointe Water Main and Phase 3B - Patriot Road Well

Physical Address View project details and contacts
City, State (County) SC   (Clarendon County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Phase 3A generally consists of the installation of water mains in approximate quantities (including Alternates): 8" water mains - 11,920 lf; 6" water mains - 1,440 lf; Water services, short side - 10 each; Water services, long side - 10 each, and related appurtenances. Phase 3B generally consists of construction of a 200 gpm well, wellhouse with chlorination facilities and installation of an existing 5,000 gallon hydro-pneumatic water tank and related appurtenances.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents