Similar Projects
Community Center Entrance Improvements
Bidding
$21,300 est. value
Yardley, PA

Property Maintenance
Bidding
Easton, PA

Pittsburgh Woolslair K-5 Waterproofing and Masonry Restoration, Phase 1 and 2
Post-Bid
Pittsburgh, PA 15224

Basement Waterproofing
Term Contract
Post-Bid
Bethlehem, PA 18015

Westmoreland County Courthouse Lobby Ceiling Renovation
Results
Green Hills, PA

Insulation and Ceiling Repairs BRD Allegheny NF PA
Results
Less than $25,000 est. value
Bradford, PA 16701

Gateway Middle School - Additions & Renovations (Lockers Construction)
Bidding
Monroeville, PA 15146

White Deer Commons Kitchen and Bath Remodel
Post-Bid
New Columbia, PA 17837

Exhibit Hall Shade Maintenance
Results
Less than $120,000 est. value
Pittsburgh, PA

Gateway Middle School - Additions & Renovations (Food Service Equipment Construction)
Bidding
Monroeville, PA 15146

Repair and Painting
Post-Bid
Uniontown, PA 15401

Pittsburgh Dilworth Prek-5 Finish and Miscellaneous Work General and Asbestos Abatement Primes
Results
Less than $360,000 est. value
Pittsburgh, PA 15206

School Desk Guards
Bidding
Braddock, PA 15104

Flame Retardant Curtains
Post-Bid
Philadelphia, PA

Intermodal Parking Garage - Waterproofing and Structural Repairs
Results
Hershey, PA 17033

Last Updated 12/21/2020 02:01 PM
Project Title

Bonnell Large Auditorium (BG20) Renovations - Flooring and Painting

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19130   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The location will be on the Main Campus of CCP at 1700 Spring Garden Street in the Main Auditorium of the Bonnell Building, also known as Room BG-20. Flooring Refresh: 1. The BG-20 Auditorium flooring refresh. 2. Removal, prep, refinish, and clean-up. 3. Coordination with other trades. Wall & Trim Refresh: cope to include painting of the walls, trim, railings and doors in the areas seen by the auditorium’s audience. The catwalk, ceiling, and back stage are not included. The re-painting scope stops where the stage curtain reaches the flanking CMU walls. 1. Surface preparation and protection 2. Patch and sand 3. Application of paint systems on interior substrates. - walls (CMU block) - door & window trim - doors - railings 4. Clean-up and completion

Details

Division 09 - Finishes, Flooring, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents