Similar Projects
Shadow Lake Dam Repairs
New Construction
Results
Morton, MS 39117

Wastewater Treatment Facilities Lagoon Levee CDBG 2020
New Construction
Post-Bid
Crenshaw, MS

NASA Stennis Space Center Miter Gate Rehabilitation Construction Contract
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Biloxi, MS

Washington County, Mississippi Levee Enlargement, ITEMS 526-L FC/MR&T, EBMRL
Renovation
Results
$1,000,000 to $5,000,000 est. value
MS

Panther Move Dirt Form Three Earthened Leeves
Results
Yazoo City, MS

Last Updated 11/01/2021 01:10 PM
Project Title

MS River MI 616-326 Stone Repairs to Revetments and Dikes, Fy21 Fc/MR&T, MS River Basin, Channel Improvement Program, (IDIQ)

Physical Address View project details and contacts
City, State (County) Vicksburg, MS 39183   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing all plant, labor, materials and equipment, and performing stone repairs to revetments and dikes at various locations on the Mississippi River between Miles 616 and 326 A.H.P. Principal features of work include grading; earth or sand fill, and subgrade excavation; stone paving, stone fill and subaqueous stone placement; removing pavement; breaking out paving; rearranging disarranged concrete paving; degrading of stone along revetments and/or stone bendway weirs; repair to dikes, including placement of stone fill in specified areas of minor damage and stone paving protection; and environmental protection. In addition, some stone dike locations will require extensive stone repairs. This work will be performed in the Mississippi River and varying water depths and currents may be encountered. Currents usually encountered at the sites of the work during low water period may vary from about one mile per hour to six miles per hour.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents