Similar Projects
Pre-Qualification of Contractors for 2022
Renovation, Infrastructure
Bidding
Manchester, NH

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Mason Street Bridge
Results
$250,000 to $300,000 est. value
Berlin, NH

Bridge Preservation Work on Two Bridges, Br. No. 125/177 and Br. No. 173/141
Results
Less than $1,628,503 est. value
Bethlehem, Carroll, NH 03575

Perch Pond Road Culvert Restoration Project
Infrastructure
Construction
$185,000 est. value
Campton, NH 03223

Adaptive Reuse of Danbury Bridge
New Construction
Post-Bid
Danbury, NH

Bridge Preservation Efforts on the Church St. Over Conn. River between Walpole, NH to Rockingham, VT
Results
Less than $1,517,815 est. value
Walpole, NH 03604

Stowell Road Covered Bridge
Renovation
Post-Bid
Merrimack, NH 03054

Washington Street Bridge Rehabilitation Project
Results
$675,000 to $725,000 est. value
Concord, NH

2022 Bridge Replacement
New Construction, Infrastructure
Post-Bid
$3,250,000 to $3,500,000 est. value
Salem, NH 03079

Cornish Windsor Covered Bridge Scour Mitigation
Results
Less than $706,766 est. value
Cornish, Windsor, NH 03244

Lempster Coach Road Bridge Replacement Project
Results
Goshen, NH

Address Preservation Needs on 5 Bridges in Hooksett and Manchester and over I-93 SB
Results
Less than $8,928,952 est. value
Hooksett, Manchester, NH 03106

Portable Modular Bridge
Results
Campton, NH

Last Updated 02/16/2022 10:08 AM
Project Title

Repairs to Mill Road Bridge

Physical Address View project details and contacts
City, State (County) Brentwood, NH 03833   (Rockingham County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of repairing undermining of footings from bridge scour by underpinning beneath the bridge footings, as well as rip-rap repairs, surface repairs of the metal arch underside, concrete repairs, clearing and grubbing, and miscellaneous site work. Work start is anticipated on or about July 1, 2021 and Substantial completion shall be achieved by August 30, 2021.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents