Similar Projects
Rooftop Unit Replacements at Thoreau Elementary School- Sub
Renovation
Bidding
$674,000 CJ est. value
Concord, MA 01742

Pole and Pad Mount Transformers
Term Contract
Sub-Bidding
Belmont, MA 02478

Traffic Signal Installation at Edgell Road
Infrastructure
Sub-Bidding
$2,598,000 CJ est. value
Framingham, MA 01701

Wastewater Treatment Facility Phase 2 Upgrades
Alteration
Post-Bid
$11,600,000 est. value
Hudson, MA

Substation 4 Transformer Testing & Repairs
Alteration
Post-Bid
Reading, MA

Well 4 Water Treatment Plant Upgrades - Phase 1 - Sub Bid
Renovation
Results
$7,292,036 CJ est. value
Maynard, MA 01754

Cambridge Electrical Department - The Shop - Slab Replacement - Sub Bid
Alteration
Results
$1,000,000 est. value
Cambridge, MA 02141

Installation of Emergency Generator and Related Equipment
Infrastructure
Sub-Bidding
$160,000 CJ est. value
Hudson, MA 01749

Theatrical Dimming System Upgrade at Canton High
Renovation, Alteration
Post-Bid
$85,000 est. value
Sudbury, MA

On-Call Electrical Services
Term Contract
Results
$100,000 est. value
Lowell, MA

Bryant Manor Panelboard and Transformer Replacement - SUB
Renovation
Sub-Bidding
$490,587 CJ est. value
Somerville, MA 02145

General Electric Work at Town Facilities for Fiscal Year 2023
Term Contract
Post-Bid
$15,000 est. value
Tyngsborough, MA

Brady Tower Development Various Electrical & Systems Replacements
Alteration
Results
$260,100 est. value
Somerville, MA

Route 38 Intersection Improvements
Infrastructure
Sub-Bidding
$3,160,766 CJ est. value
Lowell, MA 01850

Electrical Labor Only
Alteration
Post-Bid
$99,000 est. value
Somerville, MA

Last Updated 09/19/2023 03:03 PM
Project Title

Design of a Traffic Signal Reconstruction at the Intersection of Main St., Barbara Rd., Warren St. and Gore Rd., 2 nd Issue, 2023

Physical Address View project details and contacts
City, State (County) North Waltham, MA 02452   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Traffic Signal Construction at Intersection of Beaver, Warren and Pelham RFB, 2023 Last day for written Questions: Wednesday August 16th, 2023 at Noon (to cphilpott@city.waltham.ma.us) This project involves the Design of the Reconstruction of a traffic signal equipment (mast arms, signal posts, controller, cabinet, etc.) at the intersection of Main St, Barbara Rd, Warren St and Gore Rd. Also, part of the design shall include ADA compliant wheel chair ramp(s) and crosswalks as showing. The Designer shall deliver the 100% of the completed design within One hundred and eighty (180) days from the date of the Notice-to-Proceed.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents