Similar Projects
Tri-City Dog Park
New Construction - 30,000 SF
Conception
Middleburg Heights, OH 44130

Cedar Point Esports Arena
New Construction, Infrastructure
Conception
$28,000,000 CJ est. value
Sandusky, OH 44870

McCammon Creek Park Bicentennial Barn Project
Renovation
Design
$49,000 est. value
Lewis Center, OH 43035

Main Street Beach Revitalization Project
Renovation - 720 SF
Design
$450,000 est. value
Vermilion, OH

Statewide Restroom Improvements FY 21-22 - Package 4 - Mohican State Park, Pleasant Hill Lake
Renovation
Bidding
$340,000 CJ est. value
Loudonville, OH 44842

Statewide Restroom Improvements FY21-22; John Bryan State Park Package 5
Renovation
Bidding
$598,700 CJ est. value
Yellow Springs, OH 45387

Selection of Contractor for Lead Removal Abatement Project
Term Contract, Infrastructure
Sub-Bidding
$500,000 CJ est. value
Parma, OH 44129

Asbestos Hazard Abatement and Related Work
Term Contract, Infrastructure
Sub-Bidding
$315,000 CJ est. value
Carroll, OH 43112

RFQ Construction Manager at Risk - SP Lodge Improvements-Mohican and Salt ForkFY21/22
Renovation
Post-Bid
$24,415,000 CJ est. value
Lore City, OH 43755

RFQ Construction Manager at Risk - SP Lodge Improvements-Mohican and Salt ForkFY21/22
Renovation
Post-Bid
$24,415,000 CJ est. value
Lore City, OH 43755

Lead Removal Abatement Project
Alteration
Results
$78,565 est. value
Lakewood, OH 44107

Renovation of the Hyatt Regency Ballroom
Renovation
Results
$2,500,000 est. value
OH

Demolition Package For Cedar Point
Demolition, Infrastructure
Construction
$50,000 CJ est. value
Sandusky, OH 44870

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
Demolition, New Construction, Infrastructure - 492,200 SF
Pending Verification
$280,000,000 CJ est. value
Middletown, OH 45005

Urban Air Adventure Parkand Indoor Go Kart Track
Build-Out
Pending Verification
Westlake, OH

Last Updated 02/28/2023 12:18 PM
Project Title

Renovations for Magee Marsh Migratory Bird Center

Physical Address View project details and contacts
City, State (County) Oak Harbor, OH 43449   (Ottawa County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Environmental, Misc. Recreational
Contracting Method Competitive Bids
Project Status Construction Nearing Completion, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,962,862 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 28, 2023, construction is underway and expected to be completed mid-March 2023, however, an exact timeline for construction has not been confirmed. No further inquiries to be accepted. Proposed improvements include replacement of siding, windows, interior and exterior doors, flooring, HVAC, and electrical components. Additionally, the project includes installing a gas fireplace insert, new ADA restrooms, new educational displays, and septic system improvements. Designs shall incorporate the following recent improvements: metal roofing, parking lot resurfacing, and a new pedestrian bridge over the adjacent pond. The Contract Documents may be downloaded as electronic PDF files from the State's electronic bidding service at https://bidexpress.com at no charge. RFI's and substation requests shall be directed to the Project Manager, Michael Rowe, at michael@buehrergroup.com. The subject line of the e-mail should clearly read "DNR-210037 ODNR Magee Marsh RFI". Answers to any questions shall be in writing and shall be posted to https://bidexpress.com via addendum. *This project has been awarded and all trades have been let.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents