Similar Projects
Last Updated | 01/31/2022 01:35 PM |
Project Title | 20D: Kent Booster Pump Station Replacement Project Contractor Prequalification |
Physical Address | View project details and contacts |
City, State (County) | West Valley City, UT 84120 (Salt Lake County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work of this Contract includes the removal of the existing water pump station and related appurtenances, installation of new pump station with chlorination facilities and associated electrical, control, and HVAC, installation of a pressure sustaining/meter vault, installation of a 36-inch diameter steel pipe, replacement of other yard piping, piping canal crossings, new connection vault to an existing 5MG water storage tank, and installation of an 8” gravity sewer. In addition, the Work includes all civil and landscaping needs for the pump station site. See attached drawings for reference only. Drawings are not for construction. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |