Similar Projects
FedEx Ground Distribution Facility
New Construction - 182,000 SF
Construction
$19,548,843 est. value
South Burlington, VT 05403

Casella Waste Management Expansion
Addition - 19,700 SF
Construction
Williston, VT 05495

Rowley Fuels Warehouse
New Construction - 5,760 SF
Construction
$442,000 est. value
Milton, VT 05468

Astor LLC Manufacturing Warehouse Phase 1
New Construction - 9,600 SF
Construction
$387,900 est. value
Essex, VT

Landscaping Offices
New Construction - 14,694 SF
Design
$30,000 est. value
South Burlington, VT 05403

Brentwood Park Storage Units
New Construction - 6,080 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Colchester, VT 05446

Colchester Road Auto Repair Shop
New Construction, Addition - 9,400 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Essex, VT 05452

U-Haul Moving and Storage Facility
New Construction - 100,000 SF
Construction
Less than $7,367,751 est. value
Williston, VT 05495

Warehouse
New Construction - 25,560 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
South Burlington, VT

Saxon Hill Industrial Park - Phase 2 - Detached building
New Construction - 5,050 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Essex, VT 05452

Spear Street Pud
New Construction - 7,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
South Burlington, VT

St. Michael's College North Campus Development
New Construction
Design
Colchester, VT

Catamount Drive Flex Use Building
New Construction - 49,500 SF
Design
Milton, VT

Fleetpride Truck & Trailer Parts Expansion
Addition - 9,632 SF
Pending Verification
Williston, VT 05495

Greystone Industrial Park - Warehouses
New Construction - 60,000 SF
Conception
Essex, VT 05452

Reported 01/06/2020 01:31 PM
Project Title

Astor LLC Manufacturing Warehouse Phase 2

Physical Address View project details and contacts
City, State (County) Essex, VT   (Chittenden County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Qualified Bidding.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value $387,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Warehouse/Storage, 7,200 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents