Similar Projects
HVAC/Boys and Girls Club
Bidding
Moline, IL 61265

Community Housing Services Program HVAC and Plumbing
Bidding
Moline, IL 61265

Heat Treat Furnace - RIPD E4000-20-9-31
Post-Bid
Rock Island, IL 61299

HVAC Services
Post-Bid
Peoria, IL 61600

IVCC Building G AHU Replacement
Results
Oglesby, IL 61348

2020 HVAC Replacement
Results
Wheeling, IL 60090

D128 Summer HVAC Upgrades at Libertyville HS
Bidding
Libertyville, IL 60048

L/A HVAC Testing and Balance
Post-Bid
Peoria, IL 61635

Replace Chiller
Results
$1,000,000 to $1,400,000 est. value
Elgin, IL 60123

HVAC Air Filters- District Wide
Term Contract
Bidding
Algonquin, IL

HVAC Preventative Maintenance for Lake County Public Works Facilities and the City of Waukegan
Term Contract
Post-Bid
Libertyville, Waukegan, IL 60048

Sports and Recreation Center HVAC Replacement
Results
De Kalb, IL 60115

HVAC Upgrades
Renovation
Bidding
Chicago, IL 60605

FSCC Chiller Maintenance
Post-Bid
Chicago, IL 60608

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Last Updated 12/30/2020 10:51 AM
Project Title

Flora City Hall and Public Works Building HVAC

Physical Address View project details and contacts
City, State (County) Flora, IL   (Clay County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of heating and cooling systems at Flora City Hall 1. Removal of six (6) Lenox furnaces. 2. Removal of five (5) Lenox Air Conditioners. 3. Removal of five (5) Evaporator Coils. 4. Properly dispose of all old equipment. 5. Install 6 new 96% high efficiency 100,000 BTU gas furnaces. 6. Install 5 new 15 Seer, 4 ton A/C 208/230 A 3 phase air conditioners. 7. Install 5 new 4 ton matching coils. 8. Complete connection of flues, ducts, electrical circuits and refrigeration lines. 9. Install 6 digital thermostats to match systems. 10. Repair or replace any electrical circuits in need on roof associated with new equipment. 11. Replace insulation on line sets on roof. 12. Repair or replace mounting boards for condensers. 13. Test al systems. 14. All work to be performed to current applicable building codes. 15. Removal and disposal of all debris. Replacement of cooling system at Flora Public Works Building 1. Removal of 2 (two) 3 ½ ton A/C condenser units. 2. Removal of 2 (two) Evaporator coils from existing equipment. 3. Properly dispose of all equipment. 4. Install 2 (two) 15 Seer 3 ½ ton A/C 208/230 A 3 phase air conditioners. 5. Install 2 (two) 3 ½ ton matching coils in existing equipment. 6. Compete connection of all electrical circuits and refrigerant lines with replacement if necessary. 7. Replace insulation on line sets. 8. Test all systems. 9. All work to be performed to applicable building codes. 10. Removal and disposal of all debris.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents