Similar Projects
Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Canyonlands Field Airport Upgrade to Terminal Building Roof Top Units
Post-Bid
Moab, UT 84532

DFCM Construction-Standard Low Bid-DWS Admin Building HVAC and Controls (Bas/Access)-Phase II
Results
$985,800 est. value
Salt Lake City, UT 84101

Holbrook Elementary Hvac Renovation
Results
$1,000,000 to $1,250,000 est. value
Bountiful, UT 84010

Salt Lake County Automatic Build DDC and HVAC Controls
Term Contract
Post-Bid
Salt Lake City, UT 84190

East Layton Elementary Boiler and Chiller Replacement
Results
$125,000 to $250,000 est. value
Layton, UT 84040

Commercial HVAC and Building Controls Pt.2
Term Contract
Post-Bid
Salt Lake City, UT 84114

Residential HVAC Services
Term Contract
Results
Salt Lake City, UT 84114

H999--Test, Inspect and Certify Medical Air, Oxygen, Nitrus Oxide and Medical Vacuum Systems
Post-Bid
Salt Lake City, UT

Mechanical Upgrades
Results
Ogden, UT 84404

SLCC TRC CT Dust Collector
Post-Bid
Salt Lake City, UT 84130

SLCo ADC Heat Exchanger Replacement
Results
$90,000 to $100,000 est. value
Salt Lake City, UT 84119

Chiller Maintenance Program
Post-Bid
Salt Lake City, UT 84111

HEB Southeast Tower Fume Hood Upgrade
Results
$1,521,698 est. value
Salt Lake City, UT 84112

Kanab Center Foundation Venting
Post-Bid
Kanab, UT 84741

Last Updated 08/18/2021 07:14 AM
Project Title

DFCM Construction - Pre Qualified Mechanical - UVU CS Bldg HVAC and Fire Damper Upgrades

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $395,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes removing and replacing existing fire dampers and HVAC control dampers in the U.V.U. Computer Sciences building. Fire dampers will be replaced and be taken off the old pneumatic system and upgraded to DDC. The required modifications to the fire panel to accommodate proper operation will be completed as part of the project.

Details

Division 01 - General Requirements, Facility Services Performance Requirements, Fire Suppression Performance Requirements.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents