Similar Projects
Hollenbachs Bridge
Demolition, New Construction, Infrastructure
Conception
$2,284,370 CJ est. value
Schnecksville, PA 18078

Hollenbachs Bridge
Demolition, New Construction, Infrastructure
Conception
$2,284,370 CJ est. value
Schnecksville, PA 18078

Powder Valley Road over Indian Creek
Demolition, New Construction, Infrastructure
Design
$993,950 CJ est. value
Zionsville, PA 18092

Powder Valley Road over Indian Creek
Demolition, New Construction, Infrastructure
Design
$993,950 CJ est. value
Zionsville, PA 18092

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Roadway Asphalt Milling
Infrastructure
Bidding
$173,930 CJ est. value
Allentown, PA 18101

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Devonshire Road - Mill, Grade and Overlay
Infrastructure
Post-Bid
Allentown, PA 18103

2021 FB Modified Pavement Overlay, Seal Coat and Fog Seal
Infrastructure
Results
Allentown, PA

2021 Roadway Crack Seal, Chip Seal, Mastic and Fog Seal
Infrastructure
Results
Allentown, PA

Whitehall-Coplay School District New Elementary School - General
New Construction, Infrastructure - 95,835 SF
Construction
$22,424,000 CJ est. value
Whitehall, PA 18052

Maulfair Drive Drainage Improvements Project
Infrastructure
Construction
$395,899 CJ est. value
Salisbury Township, PA 18103

Penn Square Section 6
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Allentown, PA 18103

Penn Square Section 6
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Allentown, PA 18103

Limeport Pike over Saucon
Infrastructure
Conception
$3,490,250 CJ est. value
Coopersburg, PA 18036

Last Updated 03/01/2023 07:08 AM
Project Title

309 and Tilghman Interchange (I/C) Reconstruction

Physical Address View project details and contacts
City, State (County) Allentown, PA 18104   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $67,999,570 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PA 309 from the I-78 overpass to Ridgeview Drive. As of March 01, 2023, the project is in development stage. Anticipated letting date is April 11, 2024. PennDOT - 309 and Tilghman Interchange (I/C) Reconstruction *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents