Similar Projects
Precast Modular Bridge System for the Bank Street Bridge Replacement
New Construction
Bidding
Goshen, NY

Dewitt-Manlius Road Cr 53 - Kirkville Road - Over Limestone Creek Deck Replacement
New Construction
Bidding
Manlius, NY

Rehabilitation of Conklin Avenue Bridge over Pierce Creek (BIN 2003610) and Belden Street Bridge over Pierce Creek (BIN 2226260) PIN 9754.02
Post-Bid
Binghamton, NY 13901

Replacement of McGraw Road Bridge over Chittenango Creek - PIN 2754.47
Post-Bid
Wampsville, NY 13163

2019 Columbia County Multi-Bridge Element-Specific Bridge Work
Results
Hudson, NY

Murdock Road Over Tsatsawassa Creek Bridge Replacement (BIN 2201870)
Term Contract
Results
Nassau, NY 12123

Wrong Way Driving and Low Bridge Clearance Countermeasures
New Construction
Bidding
$900,000 est. value

Replacement of Bridge PV-17 (Bin 3343590) Mill Lane, Over Unnamed Creek
Post-Bid
Pleasant Valley, NY 12569

Bridge Replacement of NT Rte 417 over Root Creek in the Town of Bolivar
Results
Less than $1,600,000 est. value
Bolivar, NY 14715

2020 Bridge Deck Sealing of 22 Bins and Washing of 218 Bins
Post-Bid
Little Valley, NY 14755

Replacement of the I-87 Bridge over Route 207 at MP 58.43
Term Contract
Results
NY

Replacement of CR 42 (Merrick Road) Bridge over West Branch of Deer Creek
Post-Bid
Malone, NY 12953

Replacement of the Old State Road Bridge over I-90, at Milepost 150.81 and Bridge Rail Work at Milepost 165.10
Term Contract
Results

Emergency Repair of Hickory Grove Bridge
Post-Bid
Mamaroneck, NY 10543

Replacement of Simmons Road Bridge over Little Beards Creek
Results
Perry, NY 14530

Reported 02/18/2021 12:00 AM
Project Title

West Colvin Street Over Onondaga Creek Bridge Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Syracuse, NY 13200   (Onondaga County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope of work includes: Removal and replacement of the existing bridge joint; Concrete repairs to the bridge substructures; Bridge bearing replacement (fixed and expansion bearings Bridge’s structural deck partial depth repairs; Removal and replacement of the existing bridge deck wearing surface with a new dense concrete wearing surface overlay; Removal and replacement of stone bridge curbs; Protective sealing of substructure concrete, sidewalks, and fascia; Localized structural steel painting (beam ends); Removal and replacement of the bridge railing; Milling and paving bridge approaches; Removal and replacement of the existing 8-inch water service attached to the underside of the bridge structure; Removal and proper disposal of asbestos-containing materials (pipe wrap).

Details

Bridge, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents