Last Updated 08/28/2020 05:57 AM
Project Title

I-20-4541 - Noise Abatement Wall Construction

Physical Address View project details and contacts
City, State (County) IL   (Cook County)
Category(s) Environmental
Sub-Category(s) Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location The location of services to be performed on the Tri-State Tollway (I-294) between Mile Post 37.7 and Mile Post 38.3 in Cook County, Illinois The scope of the work shall consist of The work under this contract includes, but is not limited to: 1.) Removal of existing wooden sight screen from O’Hare Oasis East parking lot and existing guardrail. 2.) Removal of concrete barrier, shoulder, pavement, and guardrail from Irving Park Road Ramp C. 3.) Construction of noise abatement wall ground mounted and structural mounted at both locations 4.) Re-grading in front and back of the proposed noise abatement wall. 5.) Installation of guardrail, moment slab other related items. 6.) Maintenance of Traffic including detour for Ramp C.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents