Similar Projects
Wausau - Merrill Const / Recondition
Infrastructure
Design
$3,000,000 CJ est. value
Merrill, WI 54452

Wausau - Merrill Const / Recondition
Infrastructure
Design
$3,000,000 CJ est. value
Merrill, WI 54452

Developed Recreation Site Improvements - Chequamagon/Nicolet National Forest
Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Rock Falls, WI 54452

Developed Recreation Site Improvements - Chequamagon/Nicolet National Forest
Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Rock Falls, WI 54452

Merrill Site Improvements
Infrastructure
Post-Bid
Merrill, WI 54452

Chip Sealing Rock
Infrastructure
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Road Improvements
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Asphalt Replacement
Infrastructure
Bidding
$2,330,000 CJ est. value
Irma, WI 54442

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Merrill - Tomahawk, Bridge B-35-0053
Infrastructure
Results
$40,000 est. value
WI

2022 Pulverizing
Infrastructure
Post-Bid
WI

West Somo Avenue Rehabilitation and Marks Street Utility Improvements
Infrastructure
Results
Tomahawk, WI 54487

Last Updated 02/16/2023 03:17 PM
Project Title

Street/Utility Construction Project

Physical Address View project details and contacts
City, State (County) Merrill, WI 54452   (Lincoln County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $568,280 [brand] Estimate
Plans Available from Agency's Affiliate - 02/03/23
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located on E Tenth Street between N Center Ave. and Lake Street. The Owner reserves the right to reject any and all bids or to accept any bid deemed to be in the best interest of the owner and to waive any informalities in the bidding.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents