Similar Projects
HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

Installation of Two Waste Oil Heaters
Results
Wilmington, NC

HVAC Preventive Maintenance and Repair Services
Results
Wilmington, NC 28401

EMD Facility HVAC Upgrades
Results
Wilmington, NC

Removal and Replacement of HVAC Systems - Multiple Locations
Alteration
Post-Bid
Wilmington, NC

NHHS Princess Street Gym HVAC System
Alteration
Post-Bid
Wilmington, NC 28401

Indoor Air Quality Improvements
Alteration
Bidding
$1,950,000 est. value
Wilmington, NC

WPD Head-Quarters Chiller Replacement and Evidence Room
Alteration
Results
Wilmington, NC

AHU Coil and Duct Cleaning for the NC Aquarium at Fort Fisher
Alteration
Results
Kure Beach, NC 28449

Wrightsville Beach Elementary School - Humidity Control DOAS System
Alteration
Post-Bid
Wrightsville Beach, NC 28480

College Road Early Childhood Center Rooftop Unit Replacement
Alteration
Bidding
Wilmington, NC 28412

Removal and Replacement of HVAC System - Legion Stadium Fieldhouse
Alteration
Post-Bid
Wilmington, NC 28412

Wrightsboro Elementary School Building 500 Kitchen and Dining HVAC Replacement
Results
Less than $90,000 est. value
Wilmington, NC 28401

City Hall/Thalian Hall HVAC Upgrades
Results
$2,497,800 est. value
Wilmington, NC

Needlepoint Bipolar Ionization Various Schools
Post-Bid
Wilmington, NC 28412

Reported 02/24/2022 12:00 AM
Project Title

HVAC Preventative Maintenance

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28405   (New Hanover County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall include one (1) annual comprehensive maintenance action, and three (3) operational maintenance actions for the Forecast Office (three Air Handler Units, two Bard wall mounts units) and the NEXRAD RADAR Site (three external mount systems on two buildings) that will include coil cleaning, filters replacement, belt changes, motor megger, lubrication, gas pressure checks and/or replacement, and all visual inspections. Also, all system dampers and linkage will be checked for proper operation and will be lubricated annually. All filters will be changed at least four (4) times a year. Contractor shall also provide one (1) annual comprehensive inspection of the Control System, and three (3) operational inspections. All items are covered in the specs and checklist attachments. These visits shall include control loop tuning, temperature calibrations, voltage verifications and software archival.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents