Similar Projects
SP Morton Elementary School Toilet Renovations
Renovation - 72,263 SF
Bidding
$400,000 est. value
Franklin, VA 23851

Construction Manager at Risk for Hardy Elementary School
New Construction - 106,000 SF
Post-Bid
Smithfield, VA

Pole Building for County Storage
New Construction - 1,440 SF
Post-Bid
Eastville, VA

ORF Jetbridge Replacement
Results
Norfolk, VA 23518

5kV South Distribution Center Relocation and Replacement, National Airport
Results
$3,000,000 to $5,000,000 est. value
Arlington, VA 22202

Fredericksburg Christian Elementary School
New Construction - 48,400 SF
Construction
$3,640,000 est. value
Fredericksburg, VA 22408

St. Patrick's Church and School
New Construction - 45,874 SF
Construction
$10,000,000 est. value
Fredericksburg, VA 22407

West End Transitway - Phase 1 Improvements
Post-Bid
Alexandria, VA

Parking Lot Extension At Wells Elementary
Results
Chesterfield, VA

Mountain View Elementary School Addition and Renovation
Renovation, Addition - 78,804 SF
Construction
$3,309,000 est. value
Haymarket, VA 20169

Jouett Elementary School Additions and Renovations
Renovation, Addition - 22,000 SF
Post-Bid
Mineral, VA 23117

Security Vestibules for Stonewall Jackson and Washington Lee Elementary Schools
Results
Bristol, VA

Construction, New Ettrick Elementary School
New Construction - 95,944 SF
Construction
$27,000,000 est. value
Petersburg, VA 23803

Entry Modifications for 10 Elementary Schools
Renovation
Post-Bid
VA

Edwards Ferry Road Bus Shelters and Sidewalk
Results
Leesburg, VA

Last Updated 05/06/2021 01:02 PM
Project Title

J.G. Hening Elementary School New Freezer Construction

Physical Address View project details and contacts
City, State (County) Richmond, VA 23234   (Chesterfield County)
Category(s) Education, Transportation
Sub-Category(s) Elementary School, Misc. Structures
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,999,999
Plans Available from Architect - 04/06/21
Owner View project details and contacts
Architect View project details and contacts
Description

Limited demolition of existing construction and construction of a new outdoor freezer facility, including elevated concrete slab-on-grade and pre-engineered canopy cover located at J.G. Hening Elementary School.

Details

1 Misc. Structures, 140 SF New Construction.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Site Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Gypsum Board, Tiling, Ceramic Tiling, Resilient Flooring, Resilient Sheet Flooring, Vinyl Sheet Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Protective Covers.
Division 11 - Equipment, Foodservice Storage Equipment, Walk-In Freezers.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork, Soil Treatment, Termite Control.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents