Similar Projects
Classroom Climate / Three Rivers Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Conception
$525,347 CJ est. value
Sunriver, OR 97707

Classroom Climate / La Pine Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Conception
$406,962 CJ est. value
La Pine, OR 97739

Lookout Point Powerhouse Heat Pump Ventilation
Alteration
Design
$250,000 to $500,000 est. value
Lowell, OR 97452

Replace Rooftop AHU USDA-ARS-PWA Corvallis
Renovation
Bidding
$5,000,000 CJ est. value
Corvallis, OR 97330

Eoycf Walk-in Chiller & Freezer Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Tillamook, OR 97141

Rex Putnam High School Chiller Replacement
Renovation
Sub-Bidding
$635,000 CJ est. value
Milwaukie, OR 97267

J041--Mitsubishi & York Chiller Repairs
Term Contract
Post-Bid
White City, OR 97503

Wood Stove Exchange
Alteration
Post-Bid
Hillsboro, OR

OR-Malheur NWR-HVAC
Term Contract
Results
Portland, Princeton, OR 97721

OR-Malheur NWR-HVAC
Term Contract
Results
Portland, Princeton, OR 97721

Classroom Climate / High Lakes Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$20,189 CJ est. value
Bend, OR 97701

Classroom Climate/WE Miller Elementary- 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$367,666 CJ est. value
Bend, OR 97703

Classroom Climate / Rosland Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Conception
$287,450 CJ est. value
La Pine, OR 97739

Astoria District 1 Office HVAC Replacement
Renovation
Sub-Bidding
$160,000 CJ est. value
Astoria, OR 97103

ODF HVAC Direct Digital Control System Upgrade Project: Salem Campus & Tillamook Forest Center
Renovation
Post-Bid
$856,535 CJ est. value
Salem, OR 97301

Last Updated 09/21/2023 05:11 AM
Project Title

EOU Head Start HVAC Upgrades

Physical Address View project details and contacts
City, State (County) La Grande, OR 97850   (Union County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $194,092 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

EOU Head Start is seeking proposals from qualified vendors for the installaOon of or improvements to exisOng HVAC systems at our classroom faciliOes located across Union County and Baker City in Baker County to improve efficiency, performance, and air quality. Scope of Work: The scope of work for this project includes the following: Design and installaOon of a new HVAC system where necessary Removal and disposal of exisOng HVAC equipment that is outdated. Ductwork modificaOons and improvements where necessary InstallaOon of new thermostats and controls where necessary Start-up, commissioning, and tesOng of the new system Training for EOU Head Start staff on operaOng and maintaining new systems. Warranty and ongoing maintenance services HVAC systems will include air scrubbers or other air quality improvement equipment. General Proposal Requirements: Interested vendors are requested to provide a detailed proposal that includes the following informaOon: Company name, CCB#, and proof of insurance must include $1,000,000 general liability and $500,000 automobile coverage. Proposed system design, including equipment specificaOons and energy efficiency raOngs. InstallaOon Omeline and project schedule Cost esOmate, including all labor, materials, permits, and equipment. Warranty and maintenance service offerings LocaOon Specific Requirements: La Grande Head Start, 810 14 th Replace two bard units, one gas furnace and elevate three heat pumps. Install seven air scrubbers. La Grande Odyssey 402 K Ave La Grande, OR 97850 Replace four electric Bard Units, electric heat pumps, and one gas Bard unit, and install five air scrubbers Union Head Start, 426 College Air scrubbers only for one exisOng system Elgin Head Start, 180 10th Replace two Bard units and install two air scrubbers Baker Head Start, 1927 16th Replace three air handlers and heat pumps. Upgrade to 410A. Replace bath fan covers, vents and thermostats. Install three air scrubbers. Baker City Relief Nursery, 1925 16th Install mulO-zone outdoor unit, three indoor heads. Install three air scrubbers. The vendor will need to subcontract an electrician for this installaOon to set the outdoor unit on a pad, line sets to run up the wall, and cover it with line hide. Project Budget: This project is grant-funded by the Oregon Department of Human Services. The approved project budget is $194,092.00 and the total cost of the project cannot exceed this budget.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents