Similar Projects
Clements Ferry Road Water and Wastewater Relocations Phase 2
Post-Bid
Charleston, SC 29401

Savage Road at Savannah Highway and Etiwan Avenue Water Main Improvements
Post-Bid
Charleston, SC 29401

Beach Club Villas Water Main Replacement
Results
Isle of Palms, SC 29451

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Savage Road at Savannah Highway and Etiwan Avenue Water Main Improvements
Post-Bid
Charleston, SC 29402

Port Access Road Water Main Relocations - Phase I-E
Results
Less than $969,977 est. value
Charleston, SC 29401

Huger Street and King Street Water Main Replacement Project
Post-Bid
Charleston, SC 29401

Utilities Locating Services for TTC 2020
Results
Charleston, Hollywood, Moncks Corner, North Charleston, Saint George, SC

Ben Sawyer Intracoastal Waterway Water Main Crossing
Post-Bid
Charleston, SC 29401

Installation of Water Meters at Cooper River Court
Results
Charleston, SC 29403

Materials Contract
Term Contract
Post-Bid
Mount Pleasant, SC 29464

Meter Obstruction Abatement - Harborgate Shores
Results
Mount Pleasant, SC 29464

Rivers Avenue at TTC 30-Inch Transmission Main Offset
Post-Bid
Charleston, SC 29402

Dunecrest Lane Water Main Replacements
Results
Isle of Palms, SC 29451

Hollywood/Ravenel Water Main Extension Phase 3
Post-Bid
Charleston, SC 29401

Reported 02/06/2020 12:00 AM
Project Title

Elliott Cut Crossing 20-Inch Water Transmission Main Project

Physical Address View project details and contacts
City, State (County) Charleston, SC 29401   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Horizontal Directional Drill Subcontractor for the Elliott Cut Crossing 20-Inch Water Transmission Main Project. The Work to be performed consists of an approximately 2500 linear foot river crossing of 24-inch (OD) HDPE waterline to be installed by Horizontal Directional Drill.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents