Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Elevator Construction and Renovations to the Pittsburgh Student Achievement Center - Electrical Construction (Rebid)
Renovation
Sub-Bidding
$700,000 CJ est. value
Pittsburgh, PA 15213

Paynter Elementary Wireless Network
Renovation
Sub-Bidding
$710,000 CJ est. value
Pittsburgh, PA 15227

Electrical Rehabilitation, Repair, and Renovation
Term Contract
Post-Bid
Pittsburgh, PA

Wastewater Treatment Plant Upgrade Phase 2 Project - Electrical Construction
Alteration
Post-Bid
$3,250,000 est. value
Clairton, PA

Center for Faculty Innovation Building Alterations - Electrical Construction
Results
Pittsburgh, PA 15212

LRT High Platform Station Improvements - Electrical Work
Results
Pittsburgh, PA 15222

Monongahela Incline Phase II Rehabilitation - Electric
Alteration
Post-Bid
Pittsburgh, PA 15211

Moon Golf Club Storage Building - Electrical Construction
Results
Moon Township, PA 15108

Manchester and Pitt Tower HVAC and Electrical Upgrades
Alteration
Post-Bid
Pittsburgh, PA 15212

Uninterruptable Power Supply Enclosure Panel
Results
Pittsburgh, PA

TMP MMC - Bid Package G - Electrical, Plumbing/Fire Suppression and Mechanical Trades
Alteration
Post-Bid
Pittsburgh, PA 15231

Athletic Building of the South Allegheny Stadium - Electrical Construction
Alteration
Results
McKeesport, PA 15133

Extended Parking Lot 5Kv Feeder Replacement Lot - Electrical
Alteration
Post-Bid
Pittsburgh, PA 15231

Municipal Building Renovations - Electrical Construction
Alteration
Results
Pittsburgh, PA 15227

Last Updated 01/20/2023 09:31 AM
Project Title

SR 0910 (Wexford-Bayne Road) and Cole Road Traffic Signal Controller Replacement

Physical Address View project details and contacts
City, State (County) Wexford, PA 15090   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $198,359 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 20,2023 , this project has not yet been awarded. The project is expected to be awarded the end of the February.** Estimate range of $20,000-$35,000 For the SR 910 and Cole Road Traffic Signal Controller Replacement project at the following intersection: SR 0910 (Wexford-Bayne Road) and Cole Road Bids A certified check or bank draft payable to the order of Marshall Township, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount not less than ten percent (10%) of the total bid shall be submitted with each bid. All bids must be submitted on a lump sum basis. Marshall Township reserves the right to reject any and all bids or to waive any informality in the bidding. Bidders must be pre-qualified by the Pennsylvania Department of Transportation and submit proof thereof with their bid. Bidder shall comply with all state and federal laws prohibiting discrimination in hiring or employment opportunities. Pennsylvania prevailing minimum wage rates will apply. Bids may be held by Marshall Township for a period not to exceed forty-five (45) days from the date of opening of Bids for the purpose of reviewing the bids and investigating the qualifications of Bidders prior to awarding the Contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents