Similar Projects
Last Updated | 01/20/2023 09:31 AM |
Project Title | SR 0910 (Wexford-Bayne Road) and Cole Road Traffic Signal Controller Replacement |
Physical Address | View project details and contacts |
City, State (County) | Wexford, PA 15090 (Allegheny County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $198,359 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of January 20,2023 , this project has not yet been awarded. The project is expected to be awarded the end of the February.** Estimate range of $20,000-$35,000 For the SR 910 and Cole Road Traffic Signal Controller Replacement project at the following intersection: SR 0910 (Wexford-Bayne Road) and Cole Road Bids A certified check or bank draft payable to the order of Marshall Township, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount not less than ten percent (10%) of the total bid shall be submitted with each bid. All bids must be submitted on a lump sum basis. Marshall Township reserves the right to reject any and all bids or to waive any informality in the bidding. Bidders must be pre-qualified by the Pennsylvania Department of Transportation and submit proof thereof with their bid. Bidder shall comply with all state and federal laws prohibiting discrimination in hiring or employment opportunities. Pennsylvania prevailing minimum wage rates will apply. Bids may be held by Marshall Township for a period not to exceed forty-five (45) days from the date of opening of Bids for the purpose of reviewing the bids and investigating the qualifications of Bidders prior to awarding the Contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |