Similar Projects
Residential Plumbing Contractor
Post-Bid
Detroit, MI

Rouge Valley Sewerage Disposal System (RVSDS) SRF Construction Projects: Phases 1E, 1F and 1G
Renovation, Infrastructure
Post-Bid
$350,000 CJ est. value
Dearborn Heights, MI 48127

Water Resources Recovery Facility (WRRF) PS No.1 Discharge Gate Valves
Alteration
Results
$100,000 est. value
Detroit, MI

Underground Plumbing
Infrastructure
Results
$27,800 CJ est. value
Detroit, MI 48226

Pool Pump
Infrastructure
Post-Bid
Dearborn, MI

2022 Water Main Rehabilitation
Infrastructure
Results
$1,453,875 CJ est. value
Taylor, MI 48180

Maintenance, Repair, Replacement and Installation of plumbing
Alteration
Post-Bid
Detroit, MI

Parking Lot Reconstruction St. Clare of Montefalco Parish
Infrastructure
Results
$1,288,220 CJ est. value
Grosse Pointe Park, MI 48230

Trade Package 22A - Plumbing
Renovation
Post-Bid
$11,250 CJ est. value
Detroit, MI 48214

Wholesale Water Meter Pit Rehabilitation and Meter Replacement Phase II
Infrastructure
Results
$15,679,152 CJ est. value
Detroit, MI 48226

Plumbing Supplies for a One Time Purchase
Term Contract
Post-Bid
Detroit, MI 48226

Lane Lines for Dunworth Pool
Infrastructure
Results
$22,615 CJ est. value
Dearborn, MI 48126

One Year Guaranteed Pricing - Water System - Small Parts
Term Contract
Post-Bid
Romulus, MI 48174

Rouge River AOC Riverview Park Levan Knoll Habitat Restoration Project
Infrastructure
Results
$1,727,915 CJ est. value
Livonia, MI 48150

Two Year Contract Pricing for Large Water Parts -Water Hydrants
Term Contract
Post-Bid
Romulus, MI 48174

Last Updated 08/21/2023 09:22 AM
Project Title

Cobb Park Playground and Parking Improvements

Physical Address View project details and contacts
City, State (County) Southgate, MI 48195   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000323630 The proposed project is for the construction of approximately 510 SYD of concrete off-street parking, 195 LFT of curb and gutter replacement, 1535 SFT of sidewalk removal and replacement, 170 LFT of storm sewer with catch basins, swale grading and a new asphalt basketball court. The project anticipated start date is August 21, 2023 and is to be substantially completed by September 15, 2023. All questions shall be directed to John M. Miller, Project/Construction Manager by email at jmmiller@hengineers.com. All questions must be submitted five (5) business days prior to Tuesday, July 25, 2023. Bidders must deposit, with their bid, surety in the form of a certified check, bank draft, or bid bond, in the sum of five percent (5%) of the amount of the proposal. Question Acceptance Deadline 07/18/2023 03:00 PM EDT Questions are submitted online No

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents