Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 4057 over Brush Run
Infrastructure
Design
$1,432,216 CJ est. value
Blaine Township, PA 15312

PA 18 over Chartiers Creek-2
Demolition, New Construction, Infrastructure
Design
$2,130,818 CJ est. value
Washington, PA 15301

2nd Street Waterline Replacement
Infrastructure
Bidding
$130,000 CJ est. value
Charleroi, PA 15022

Brush Run Water Pollution Control Plant Plant Water System Upgrade
Renovation, Infrastructure
Bidding
$575,000 CJ est. value
McMurray, PA 15317

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Place Superpave Asphalt, Wearing Course, Scratch Course, Leveling Course and Manhole Adjustments
Infrastructure
Post-Bid
$180,000 CJ est. value
Blaine Township, PA 15312

Bridge Bearing Cleaning 12-0
Infrastructure
Results
$200,000 to $499,999 est. value

Fire Substation - Final Site Work
Infrastructure
Results
$200,000 est. value
Eighty Four, PA 15330

Abandoned Mine Reclamation (AMR) Monongahela South No. 1 - Phase 2
Infrastructure
Construction
$493,352 CJ est. value
Monongahela, PA 15063

Abandoned Mine Reclamation (AMR) Monongahela South No. 1 - Phase 2
Infrastructure
Construction
$493,352 CJ est. value
Monongahela, PA 15063

Field 5 Turf Replacement - Peters Township
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Venetia, PA 15367

PA 18 over Chartiers Creek - 1
Infrastructure, Renovation
Design
$4,498,863 CJ est. value
Washington, PA 15301

Bentleyville Road Waterline Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Charleroi, PA 15022

Last Updated 09/21/2023 04:06 AM
Project Title

Retaining Wall on Smokey Row Road (T-609)

Physical Address View project details and contacts
City, State (County) West Finley, PA 15377   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The municipality reserves the right to reject any or all proposals. The project consists of: 1. Dig out slip area 80 feet. 2. Township to haul spoil away. 3. Drill and drive retaining wall beams 8 centers and into bed rock. 4. Dig out road area and drill for dead man beams. 5. Drive dead man beams and weld on kicker beams. 6. Concrete around beams. 7. Install 6 rows of 2x8x6 concrete lagging with 2 weep holes. 8. Extend beams above road surface approximately 3. 9. Place township supplied stone and back fill to roadway surface. 10. Weld on 4 beams horizontally on roadside of piling and flat bar on backside of beams. All items shall be included as one complete job.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents