Similar Projects
La Padera - El Camara Storm Improvement
Infrastructure
Bidding
$793,000 est. value
MO

South Broadway at Meramec Combined Sewer Relief
Infrastructure
Bidding
$1,215,000 est. value
MO

Union Road 100 Block Storm Improvements
Post-Bid
Saint Louis, MO 63114

2021 Emergency Repairs and On-Call Sewer
Term Contract
Post-Bid
Joplin, MO

Stanwood Dr and Belwood Dr Storm Sewer & Bank Stabilization
Results
$351,000 est. value
Normandy, MO 63121

Euclid 4130 and 4136 Bioretention CSO VR GI
Results
$250,000 est. value
Saint Louis, MO

Stormwater Update
Alteration
Pending Verification
Jefferson City, MO 65109

Stormwater Update
Alteration
Pending Verification
Jefferson City, MO 65109

Rock Bridge High Peach Tree Connector Driveway
Infrastructure
Post-Bid
Columbia, MO 65203

Minnie Ave to Greenhaven Storm Sewer Separation
Results
$183,000 est. value
Flordell Hills, Jennings, MO

Great Rivers Greenway Connector Project Part A
Infrastructure
Post-Bid
$3,000,000 est. value
Brentwood, MO 63144

Russellville Stormwater Improvement
Results
Russellville, MO

Rough Site Grading, Parking and Installation of Storm Water System for the A. Perry Philips Park Tennis/Pickleball Complex
Infrastructure
Post-Bid
Columbia, MO

Willow Hill Stormwater Infrastructure
Results
Ladue, MO 63124

Rough Site Grading, Parking, and Installation of Storm Water System for the A. Perry Phillips Park
Infrastructure
Post-Bid
Columbia, MO 65201

Last Updated 09/08/2021 12:42 PM
Project Title

Milwaukee Street Storm Improvements - Pennsylvania to Holt

Physical Address View project details and contacts
City, State (County) Lawson, MO   (Ray County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall furnish all materials, equipment, tools, and labor required to perform the following on the project: demolish and remove existing curb, install and maintain erosion control, grade and install downstream channel and outlet protection, install new storm system, install new curb & gutter, pavement, and drives, and complete all other incidental work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents