Similar Projects
Northwest 112th Place Road Infrastructure Surtax - STC073870 - Marion County
Infrastructure
Conception
$741,307 CJ est. value
Morriston, FL 32668

Northwest 112th Place Road Infrastructure Surtax - STC073870 - Marion County
Infrastructure
Conception
$741,307 CJ est. value
Morriston, FL 32668

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

Road Resurfacing
Infrastructure
Post-Bid
$300,000 est. value
Yankeetown, FL

Road Resurfacing
Infrastructure
Results
Yankeetown, FL

Mill, Place, and Compact Lime Rock and Asphalt Concrete
Infrastructure
Results
$400,000 est. value

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Northwest 145th Avenue Road Infrastructure Surtax - STC073875 - Marion County
Infrastructure
Conception
$252,000 CJ est. value
Williston, FL 32696

CR 40 From Mastadon Court to 63rd ST
Infrastructure
Bidding
$200,000 CJ est. value
Bronson, FL 32621

Emergency Land Clearing
Infrastructure
Post-Bid
Chiefland, FL 32626

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Last Updated 03/15/2023 07:12 PM
Project Title

Resurfacing

Physical Address View project details and contacts
City, State (County) Chiefland, FL 32626   (Levy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $18,473,373 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Dist/st-wide, Levy Road Name: Sr 55 Limits: From Gilchrist Co Line to Ne 8th St Project(s): 44362915201(*) Federal Aid No: D222059B Total Roadway Length: 9.570 Miles Contract Days: 360 Total Bridge Length: 0.000 Miles Total Proposal Length: 9.570 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutters, traffic signals, highway signing, sidewalk/bicycle path and other incidental construction on SR 55 (US 19) from the pavement joint East of the Suwannee River in Gilchrist County to NE 8th Street in Levy County. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 006 Resurfacing

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents