Similar Projects
Central Everglades Planning Project (CEPP) Contract 11A, EAA A-2 Reservoir Foundation & Cutoff Wall
Alteration
Bidding
$250,000,000 to $500,000,000 est. value
Belle Glade, FL

Palm Beach County Casing Under A1A at Ocean Inlet Park
Infrastructure
Bidding
$200,000 est. value
Boynton Beach, FL 33435

Vehicle Service Road Relocation
Post-Bid
$500,000 est. value
Palm Beach, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies
Results
Less than $3,000,000 est. value
West Palm Beach, FL 33401

Boynton Beach Boulevard and Acme Dairy Road
Results
FL

Unit 53 Arden - Pods D-Southeast, D-Southwest and INorth Public Improvement Project
Infrastructure
Bidding
$800,000 est. value
Palm Beach Gardens, FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Ocean Inlet Park - Marina Replacement
Results
Lake Worth, FL 33460

Canal System Dredging and Dry Detention Pond
Infrastructure
Bidding
$1,700,000 est. value
Royal Palm Beach, FL

Merchant's Drainage Improvements
Infrastructure
Post-Bid
Riviera Beach, FL

PBC Dune and Beach Restoration Annual Contract (Federalized)
Term Contract
Results
$10,961,615 to $11,103,015 est. value
Tequesta, FL 33469

Central Everglades Planning Project (CEPP) Contract 11B, EAA A-2 Reservoir Embankment and Outlet Works
Term Contract
Post-Bid
$500,000,000 est. value
Palm Beach, FL

Central Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir Project
Results
$100,000,000 to $250,000,000 est. value
Palm Beach, FL

Wabasso Drive Over LWDD LAT. 2 Canal - Federalized
Renovation, Infrastructure
Post-Bid
$800,000 est. value
West Palm Beach, FL 33409

Reported 06/30/2022 06:23 PM
Project Title

Marine Way Seawall and Promenade Construction - 17-047 - City of Delray Beach

Physical Address View project details and contacts
City, State (County) Gulf Stream, FL 33483   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected May 2023
Bids Due View project details and contacts
Estimated Value $9,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Delray Beach, Florida. Conceptual plans call for site work for a water / sewer project. This project consists of a complete design and construction of a Seawall and promenade for Marine Way. As of June 29, 2022, this project is currently in the FY 2022-2026 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 13 - Special Construction, Rammed Earth Construction, Rammed Earth Walls.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Seawalls, Waterway Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents