Similar Projects
North/Water Street Sewer Separation
Infrastructure
Bidding
Newburgh, NY 12550

Palmer Avenue Utility Reconstruction
Infrastructure
Bidding
Corinth, NY 12822

Sewer Material for the Department of Public Utilities
Term Contract
Post-Bid
Troy, NY

Precast Concrete Manholes, Catch Basins and Drywells for the year 2021
Term Contract
Post-Bid
Latham, NY 12110

Replace Septic Systems - Newcomb Campus
Results
Less than $200,000 est. value
Newcomb, NY 12852

2020-2021 Septic Tank Cleaning
Term Contract
Results
Red Hook, NY 12571

2022-23 Facilities and Operations: Pumping of Septic Systems
Term Contract
Bidding
Hopewell Junction, NY

2021 Street Sweeping and Catch Basin Cleaning Service
Post-Bid
Dover Plains, NY 12522

SSES Phase 3 Sub-Basins 2 and 10 Public Sanitary Sewer Repairs
Term Contract
Results
Tuxedo Park, NY 10987

Smoke Testing Investigation
Infrastructure
Bidding
$60,000 est. value
Lakeville, Livonia, NY

Sanitary Sewer Rehabilitation
Post-Bid
Mamaroneck, NY 10543

Continental Street Sanitary Sewer Improvements
Results
Sleepy Hollow, NY 10591

CSO 029 Reduction and Conveyance Modifications Project
Infrastructure
Bidding
Syracuse, NY 13202

Septic Tank Pumping Maintenance Service with Inspection
Term Contract
Post-Bid

Combined Sewer Overflow (CSO) Control Project C1, CSO 142 Elimination
Results
Less than $200,000 est. value
Utica, NY 13502

Last Updated 03/10/2022 11:44 AM
Project Title

North Interceptor Sewer Replacement

Physical Address View project details and contacts
City, State (County) Newburgh, NY   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing a new interceptor sewer that ranges in size between 18 and 48 inches, that is approximately 8,500 linear feet in length, including new manholes, connections to existing trunk sewers, utility relocations, site work, traffic control and bypass pumping. Intercepting sewer will be constructed with both open cut and trenchless methods.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents