Similar Projects
Synopsis- Environmental Remediation Services & Construction for Rocky Mountain Arsenal
New Construction
Design
Commerce City, CO

Carter Lake Filter Plant
Renovation, Addition
Design
Berthoud, CO 80513

WTP Lead and Copper Testing/Collection
Post-Bid
Louisville, CO

Water Treatment Plant Expansion from 5 MGD to 10
Post-Bid
Johnstown, CO 80534

Griswold Water Purification Facility Filter Improvements
Results
Aurora, CO 80012

Fort Collins Water Treatment Facility Filter Replacement
Results
Less than $2,100,000 est. value
Fort Collins, CO

Florida River Estates Water System Improvements
Renovation
Construction
$2,100,000 est. value
Durango, CO 81302

Ritoro Operations Building and Wells A-2 and D-2 Project
New Construction, Infrastructure
Construction
$2,100,000 est. value
Elizabeth, CO 80107

Justice Center New Backflow PRV Domestic Manifold Water Station
Renovation
Post-Bid
Breckenridge, CO 80424

Loveland Water Reclamation Facility Administration Building Remodel
Renovation
Results
Less than $807,340 est. value
Loveland, CO 80537

Fish Creek Filtration Plant Improvements Project Phase 2A and Phase 2BMt
Renovation
Post-Bid
Steamboat Springs, CO

Water Treatment System Improvements
Results
Glenwood Springs, CO 81601

Joseph Blake Water Treatment Plant Phase 1 Improvements
Renovation
Post-Bid
Highlands Ranch, CO 80126

Chemical Water Treatment Services
Term Contract
Results
CO

Pilot Aquifer Storage and Recovery Site Construction Manager
New Construction
Post-Bid
Northglenn, CO

Last Updated 05/31/2022 12:01 AM
Project Title

Fountain PFC Treatment Facility Superstructure

Physical Address View project details and contacts
City, State (County) Fountain, CO   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of the Project will involve the Construction of a new metal building (including all electrical and HVAC components) to house Water Treatment equipment being installed by others on an existing foundation. Work also entails site improvements including fencing, concrete sidewalk and asphalt pavement. Construction facilities, such as temporary fencing, laydown yard, graded haul route and an on-site job trailer are already present on the site and will be handed over to the successful bidder for control and maintenance.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents