Similar Projects
Arts Sculpture Laboratory - MEP
Bidding
$2,020,000 est. value
Whitewater, WI 53190

Facilities Management Courthouse Complex And County Grounds - High Voltage Maintenance Service Work
Term Contract
Bidding
Milwaukee, WI 53233

South Fork Substation MV Circuit Breakers
Post-Bid
River Falls, WI

Install Outlets Bldg 2187 in Hallway Between Rooms. 123 & 128 and in Rooms 121, 127, 129, 132, 133 (Wo 1956)
Post-Bid
Less than $25,000 est. value
WI 54656

Redundant UPS System Installation
Results
Less than $120,000 est. value
Whitewater, WI 53190

Switchgear Breaker Upgrades
Results
Less than $230,000 est. value
Madison, WI 53704

Generator and Electrical Equipment Replacement
Bidding
New Berlin, WI 53151

Uninterrupted Power Supply (UPS) and Batteries
Post-Bid
Sparta, WI 54656

2020 Public Works Garage Lighting Upgrades
Results
Less than $25,000 est. value
Monona, WI 53716

Dimming and Lighting Network Replacement
Bidding
Less than $1,304,000 est. value
Whitewater, WI 53190

Replace Electrical-Building 19 607-19-107
Post-Bid
$2,000,000 to $5,000,000 est. value
Madison, WI

LED Lighting Upgrades
Results
New London, WI 54961

Public Works Generator Replacement
Bidding
Elkhorn, WI 53121

Electrical Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Utility Renovations - Mechanical
Results
Less than $3,000,000 est. value
Madison, WI 53703

Reported 04/17/2021 12:00 AM
Project Title

Repair Frost-Heaved Flasher Base Foundation at ATW MALSR

Physical Address View project details and contacts
City, State (County) Appleton, WI   (Outagamie County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $50,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside (FAR 19.8) General Statement of Work: A. Procure parts in advance of construction from Jaquith Industries; 1. Anchor plate L5004, QTY 3 2. Anchor bolt set L5002, QTY 3 3. Epoxy kit, QTY 1 B. Procure a licensed land surveyor to record the existing MALSR Vega tower light bar elevations and exact distances from the Runway 03 Threshold to within 0.01-ft. Place a benchmark on the power distribution panel foundation. Stake out the existing light bar distance from threshold on both sides of the three light bars. C. Upon shutdown of the facility (and/or de-energizing the circuits), disconnect and remove power and control conductors at each of the three existing light bars at Station 10. Direct buried power and control cables are to be replaced from the distribution panel with new inside new Galvanized Rigid Steel Conduit (GRSC) per the drawings. D. Remove and dispose of the three existing light bars, Vega towers, and screw anchors. E. Furnish and install new conduit, conductors, and grounding in trench from the distribution rack to the three tower locations. F. Furnish and install new concrete foundations, including reinforcement steel, anchor plates, and embedded conduit and other items. Local frost depth is 60-inches, depth of foundation will be 72-inches below grade. Construct at the location necessary to match the existing lamp height and distance from the Runway 03 Threshold. G. Install breakaway kits with pole safe couplings. Install stand assemblies, conduits with associated fittings, LIR tubes and stabilizer rods on mounting frames, 5-light T-bars with tube caps and ensure lamp heads at all bars are level, and (via a licensed land surveyor) are re-established at the original design location, elevation, and angle. H. Install electric wiring harness inside each LIR pole. I. Furnish and install ground rods, grounding conductors, connections, and exothermic welding per the contract drawings. J. Furnish and install new power conductors from the distribution panel to the three new poles. Install new ground conductors and 1/0 guard wires with ground rods per specifications. All power cables shall be tested per specifications after installation in the presence of the COR and SSC technicians. A written record of the test results for all of the conductors shall be delivered to the COR. K. Provide crushed aggregate work area around light poles per drawing C004, to a depth of 6-inches and including geotextile fabric.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents