Similar Projects
Warehouse
New Construction - 800,000 SF
Conception
$10,000,000 CJ est. value
Kingston, NH

Professional Offices and Warehouse
Renovation
Conception
Merrimack, NH 03054

Hudson Logistics Center
New Construction
Design
Hudson, NH 03051

Garrison Glen
New Construction - 116,288 SF
Design
$10,000,000 CJ est. value
Exeter, NH

Manchester Patrol Shed Addition and Renovation
Renovation, Addition - 5,000 SF
Bidding
$3,122,565 est. value
Manchester, NH

Construction of Rye Salt Storage Facility
New Construction
Bidding
Rye, NH

Club Motorsports Park - Phase II
New Construction - 11,880 SF
Post-Bid
$8,000,000 to $10,000,000 est. value
Tamworth, NH 03886

Salt Shed Storage Building
Post-Bid
New Ipswich, NH

MST Metal Building Addition Design-Build
Addition
Results
Manchester, NH

Salt and Sand Shed
New Construction
Results
Danville, NH

Raytheon Expansions
Addition - 4,300 SF
Construction
Pelham, NH

Flatley Mixed Use
New Construction - 100,000 SF
Construction
$1,000,000 to $2,000,000 est. value
Merrimack, NH 03054

Amazon Distribution Center
Build-Out
Pending Verification
Hudson, NH 03051

Pitco Frialator Manufacturing Facility, Warehouse, and Offices
New Construction - 356,224 SF
Conception
Concord, NH 03301

R & L Carriers - Fleet Maintenance Garage Building
Addition - 12,960 SF
Design
Manchester, NH

Last Updated 11/09/2021 12:04 PM
Project Title

2021- Town Salt Shed Addition

Physical Address View project details and contacts
City, State (County) Deerfield, NH   (Rockingham County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing an addition to the existing salt shed at the Highway Department. The completed addition will be approximately 16’ x 34’. The foundation walls have already been poured. The Town is looking for a builder to complete the supporting walls and roof. Contractors are encouraged to visit the site to examine the existing concrete as we believe it was poured out of square to the existing building.

Details

Warehouse/Storage, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents