Similar Projects
Bowie High School - Phase 4 - 2019 Bond - Arlington Independent School District
Addition, Infrastructure, Renovation
Conception
$13,295,613 CJ est. value
Arlington, TX 76018

Phase 5 School Bond Renovation
Renovation, Addition
Conception
Arlington, TX

Phase 3 School Bond Renovation
Renovation, Demolition
Design
Arlington, TX 76010

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Design
$12,862,400 CJ est. value
Fort Worth, TX 76109

Arlington ISD Carter Junior High School Replacement Project
Demolition, New Construction, Infrastructure - 160,000 SF
Bidding
$43,000,000 CJ est. value
Arlington, TX 76010

White Settlement ISD 2022 Bond - West Early Learners Academy Additions
Addition, Renovation - 38,470 SF
Sub-Bidding
$15,000,000 CJ est. value
White Settlement, TX 76108

Eagle Mountain-Saginaw ISD Elementary #18: Remaining Trades
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Fort Worth, TX 76179

RFQ Construction Manager at Risk - Renovation of New Central Administration Building at Camp Bowie
Renovation - 139,000 SF
Post-Bid
$25,000,000 CJ est. value
Fort Worth, TX 76116

Construction Manager-at-Risk, Two-Step Process
Renovation, Addition
Results
Azle, TX 76020

Package 1 - Restroom Renovation - Lily B Clayton Elementary School
Renovation
Results
Fort Worth, TX 76110

IDEA Achieve Phase 2
New Construction - 29,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Haltom City, TX 76117

Webb Elementary School Replacement Project
Construction
$25,464,000 est. value
Arlington, TX 76011

2019 Bond - Phase 5 - Ashworth Elementary, Pearcy STEM Academy Renovations - Arlington Independent School District
Infrastructure, Renovation
Pending Verification
$2,540,000 CJ est. value
Arlington, TX 76010

2019 Bond - Phase V Projects - Arlington Independent School District
Infrastructure, Renovation
Pending Verification
$100,000,000 CJ est. value
Arlington, TX 76010

Farrell Elementary; Fitzgerald Elementary - Phase 4 - 2019 Bond - Arlington Independent School District
Infrastructure, Renovation
Conception
$4,876,750 CJ est. value
Arlington, TX 76010

Last Updated 04/11/2023 10:50 AM
Project Title

White Settlement ISD 2022 Bond - Proposition A

Physical Address View project details and contacts
City, State (County) Wht Settlemt, TX 76108   (Tarrant County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

*As of April 2023, the West Elementary Future Early Childhood Academy is out to bid through the construction manager. A schedule for the remaining portions of work has not been released. The 2022 Bond Proposition A calls for: Brewer Middle School - Two-story 6th grade center addition with 32 classrooms - New competition gym with additional entrance and parking - 7,000 sq. ft. band hall & choir room addition - Cafeteria addition and renovation that also serves as auditorium with seating capacity of 2,000 West Elementary - Future Early Childhood Academy - 2 classroom wing additions that provide 30-plus additional classrooms - Cafeteria addition and renovation - New playground and shade structure Liberty Elementary - Cafeteria addition and renovation - New gym - New classroom wing - New playground and shade structure Brewer High School - 8,000 sq. ft. band hall expansion - New competition floor in drill team gym - Competition gym renovation to increase searing capacity from 1,200 to 2,000 Tannahill Intermediate - Future Tannahill Fine Arts Academy - Relocation of fine arts academy to tannahill intermediate to provide larger elementary school, adequate fine arts facilities, and expanded fine arts academy - New playground and shade structure - Safety and security upgrades Blue Haze Elementary - New playground and shade structure - Roof replacement - Safety and security upgrades - Driveway and parking lot improvements North Elementary - New playground and shade structure - Roof replacement - Safety and security upgrades - Driveway and parking lot improvements

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents