Similar Projects
Westlakes FM 143 Water Main Extension
Infrastructure
Bidding
San Antonio, TX 78252

South Alamo Street (Market Street to Cesar Chavez Boulevard)
Infrastructure
Bidding
$15,400,000 est. value
San Antonio, TX 78204

Construction Bids for Approximately 3,200-Feet of 12-Inch Water Main Near Toutant Beauregard Road and Future Scenic Crest Blvd
Post-Bid
San Antonio, TX 78249

Clearwater Creek Phase 1A Single-Family Residential Development - Water, Sanitary Sewer, Street and Drainage Improvements
New Construction
Post-Bid
Marion, TX 78124

Annual Contract for Standard/Wide Range Repair Clamps, Tap Clamps and Couplings
Term Contract
Results
San Antonio, TX 78212

Closed Loop Systems Water Treatment
Results
San Antonio, TX

2020 CMOM Package 1 (Large Diameter)
Infrastructure
Bidding
$8,799,198 est. value
San Antonio, TX

Redbird Ranch Phase 2 Unit 1M-3 and Unit 3M-3A
Post-Bid
TX 78253

Annual Contract for Valve Preventive Maintenance Services
Term Contract
Results
Less than $260,000 est. value
San Antonio, TX

Zigmont Road 12-inch Water Main Project
Infrastructure
Bidding
$3,289,400 est. value
San Antonio, TX 78275

Settlers Ridge Sewer and Water main Replacement
Infrastructure
Post-Bid
Leon Valley, TX

Annual Contract for Fire Service Water Meters
Term Contract
Results
San Antonio, TX

Canyon Ranch Unit 1 and 2
Infrastructure
Bidding
$200,000 est. value
San Antonio, TX

Annual Contract for Water Meter Valve Locks
Term Contract
Post-Bid
San Antonio, TX

Butterfly Valve - Fittings
Results
Less than $9,888 est. value
San Antonio, TX

Reported 06/07/2022 12:00 AM
Project Title

Echtle Offsite Water Main

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,039,814 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of construction of 1,750 LF of 24 water main and related infrastructure along Masterson Road in west Bexar County.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents