Similar Projects
Last Updated | 04/21/2022 08:14 AM |
Project Title | Sanitary Sewer Metering Improvements |
Physical Address | View project details and contacts |
City, State (County) | OH (Stark County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $321,245 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The construction required will consist of provision of all labor, equipment and materials necessary to upgrade ten (10) existing flow monitoring sites located in Canton, Jackson, Perry and Tuscarawas Townships. The upgrade for each of the ten (10) meter sites shall consist of removal of all existing equipment and installation of new control panels, electrical and control conduit and wiring, metering manhole modifications, flume replacements, meter removal and installation, all electrical de-energizing and energizing, any site relocation modifications and any ancillary work as shown on the contract documents herein. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |