Similar Projects
Hollybrook Park Property Construction
New Construction
Conception
Wendell, NC 27591

Hilltop Needmore Town Park and Preserve Park
New Construction, Renovation
Conception
Fuquay-Varina, NC 27526

Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

Dorothea Dix Park Gateway Plaza and Play
Design
Less than $34,000,000 est. value
Raleigh, NC 27601

Creech Road Tennis Court Reconstruction Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Garner, NC 27529

Creech Road Tennis Court Reconstruction Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Garner, NC 27529

Request to Prequalify Vendors For Residential Asbestos Abatement Services
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Raleigh, NC 27603

Upper Pigeon House and Five Points Water and Sewer Replacement
Post-Bid
Raleigh, NC

Southeast Raleigh High School Ballfield Improvements
Results
Raleigh, NC 27610

Archives and History Building Foundation Repairs and Drainage Improvements
Renovation, Infrastructure
Results
$965,000 CJ est. value
Raleigh, NC 27601

Pleasant Park
Construction
Less than $36,000,000 est. value
Apex, NC 27502

CVS #2471 ADA
Renovation - 7,500 SF
Construction
Raleigh, NC 27612

Project Real
New Construction, Infrastructure - 150,000 SF
Pending Verification
$16,000,000 CJ est. value
Apex, NC 27502

Swing Racquet and Paddle
New Construction, Renovation, Alteration - 40,000 SF
Pending Verification
$50,000,000 est. value
Raleigh, NC 27617

Holland Road - Mixed Use Assembly
New Construction - 76,500 SF
Conception
Apex, NC 27502

Last Updated 09/12/2022 03:08 PM
Project Title

2023 Patch PIP & Turf Surface Brier Creek Park Playground

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27617   (Wake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

City of Raleigh, Parks, Recreation and Cultural Resources Department Attn: Lauryn Kabrich Email: Lauryn.Kabrich@raleighnc.gov Questions due by Sept. 2, 2022 @ 2:00 pm Scope of Work Area on plan is estimated from aerial, Patching and topcoat may vary. Use 3,300 SF for bidding purposes. Power wash entire surface, fill in gaps, patch all cracks and seams. Apply playground PIP topcoat paint to entire surface. Bid quantities of artificial turf: 2800 square feet Remove and dispose of existing mulch, install drainage and stone subbase (Crush and Run/57 Stone), remove edge of PIP surfacing and install nailer boards, provide and install approximately 2800 SF turf with 1-1/8" pad (Doesn't have to confirm to any fall zone) Provide & install temporary fencing around area under construction (LF varies).

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents