Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Wastewater Pump Station Improvements
Design
North Bay Village, FL

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Last Updated 10/18/2021 12:17 PM
Project Title

Factory-Fabricated Pump Station for 540A Booster Station Project

Physical Address View project details and contacts
City, State (County) FL   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $546,120
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, supervision, and equipment necessary to construct a new factory-fabricated, contractor installed pump station (Booster Station) in the Southwest Regional Utility Service Area (SWRUSA) water distribution system.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents