Similar Projects
Last Updated | 02/14/2022 09:41 AM |
Project Title | Middle Creek Regional Wastewater Pump Station, Force Main and Interceptor Sewer |
Physical Address | View project details and contacts |
City, State (County) | Apex, NC 27539 (Wake County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract 1 includes, but is not limited to, the construction of a triplex wastewater pump station with two 140 HP submersible pumps initially installed, precast concrete structures, solids cutter, odor control chemical feed and storage equipment, surge relief valve, flow meter, electrical service, standby power generator, electrical equipment rack, piping, valves, manholes, site clearing and grading, erosion control measures, site seeding and stabilization, landscaping, fencing, gravel access driveway construction, and final cleanup. Pump Station shall be constructed in accordance with the plans and specifications prepared by Diehl & Phillips, P.A., and with the Town of Apex Standard Specifications and details. Contract 2 includes, but is not limited to, the construction of approximately 7,850 LF of 16-inch C905 PVC force main pipe, 442 LF of 16-inch DR9 HDPE force main pipe installed by horizontal directional drilling, ductile iron fittings with Protecto 401 lining, four 16-inch resilient wedge gate valves and valve boxes, 8 combination air valve manholes, 20 tracer wire test stations, 20 force main marker posts, 2,439 LF of 18- inch C905 PVC gravity sewer pipe, 123 LF of 8-inch C900 PVC gravity sewer pipe, 7 six-foot diameter flat top precast concrete manholes, 7 five-foot diameter flat top precast concrete manholes, pipe connection into existing manhole, potholing existing utilities, asphalt repairs, stream bank stabilization, rip-rap permanent stream crossings, site clearing, erosion control measures, site seeding and stabilization, and final clean-up. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | 1 Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |