Similar Projects
West Carroll Avenue Mixed use
New Construction
Conception
Chicago, IL 60607

Bronzeville Lakefront - Phase II
New Construction - 6,700,000 SF
Conception
$3,000,000,000 to $4,000,000,000 est. value
Chicago, IL

Maintenance Offices Construction
Design
$500,000 to $1,000,000 est. value
Rock Island, IL 61299

Compass Global Logistics Hub
New Construction
Design
$1,700,000,000 est. value
Joliet, IL 60436

Pace South Campus Acceptance Facility and Office Building
Renovation
Bidding
Markham, IL 60428

Lyft Support Center
Renovation - 1,500 SF
Bidding by Invitation
Burbank, IL 60459

Addison Office Remodel and Addition
Renovation, Addition - 11,792 SF
Post-Bid
Addison, IL 60101

Kluber Architects Benton Street Office Build Out
Build-Out
Post-Bid
Aurora, IL 60506

183 CES Repair Wing HQ Stage & PA
Results
$25,000 to $100,000 est. value
Springfield, IL 62707

2-Story Office Building With Basement Renovation
Renovation
Results
Chicago Heights, IL 60411

900 West Fulton Mixed Use Development
New Construction, Renovation - 90,000 SF
Construction
Chicago, IL 60607

Metra HQ Tenth Floor Remodeling
Renovation
Construction
$3,361,906 est. value
Chicago, IL 60661

The Point at Six Corners
New Construction - 66,800 SF
Pending Verification
$130,000,000 est. value
Chicago, IL 60611

Mixed-Use Building
New Construction - 47,000 SF
Pending Verification
Chicago, IL 60642

330 North Clark Office Tower
New Construction
Conception
Chicago, IL

Last Updated 08/19/2020 04:45 PM
Project Title

Office Renovation

Physical Address View project details and contacts
City, State (County) Murphysboro, IL   (Jackson County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Architects Project No. 1909 IDPR No. 184-000255 Work consists of renovating the existing office area for new visitor enrance and lobby, toilets, and interview room. Create new business center. Replace flooring, wall and ceiling finishes, including asbestos abatement. Replace HVAC, update electrical including lighting, and revise plumbing for ADA.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories, Protective Covers, Awnings.
Division 12 - Furnishings, Window Blinds, Vertical Louver Blinds, Manufactured Wood Casework, Countertops.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Grading, Finish Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Turf and Grasses, Seeding.
Division 33 - Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents