Similar Projects
New A/C Unit for Ft Dodge
Renovation
Design
$100,000 CJ est. value
Anamosa, IA 52205

Wayne County Courthouse - HVAC System Improvements
Renovation
Bidding
$2,295,800 CJ est. value
Corydon, IA 50060

Lemme Elementary School HVAC Upgrades
Renovation
Sub-Bidding
$1,600,000 CJ est. value
Iowa City, IA 52245

Bowen Science Building - Replace Heating Valves On Glycol System
Renovation
Sub-Bidding
$108,000 CJ est. value
Iowa City, IA 52242

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Hawthorne Elementary HVAC Upgrades
Alteration
Post-Bid
Keokuk, IA 52632

Marion High School HVAC Upgrades
Alteration
Results
Marion, IA 52302

Fort Dodge Cooper Elementary HVAC Renovation
Renovation, Alteration
Results
Fort Dodge, IA

Seamans Center for the Engineering Arts and Sciences Replace AHU 10
Renovation
Sub-Bidding
$480,000 CJ est. value
Iowa City, IA 52240

Laboratory Freezer
Alteration
Post-Bid
Davenport, IA

Boone CSD High School HVAC Upgrades
Alteration
Results
$2,300,000 to $2,600,000 est. value
Boone, IA 50036

HVAC Installation and Temperature Monitoring System for Server Room – City Hall
Renovation
Sub-Bidding
$490,000 CJ est. value
Clinton, IA 52732

Washington CSD High School Mechanical Upgrades
Alteration
Post-Bid
Washington, IA 52353

Law Enforcement Center Rooftop Mechanical Replacement
Alteration
Results
Algona, IA 50511

Water System Improvements
Term Contract
Post-Bid
Storm Lake, IA 50588

Last Updated 03/29/2023 11:16 AM
Project Title

Story County Human Services Center HVAC Equipment Replacement REBID

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract includes replacement of rooftop and interior HVAC equipment, associated mechanical and electrical work, repairs to existing membrane roof assemblies, selective interior demolition, replacement of interior finishes and other related work. Bids received after the time and date stated above will not be considered and will be returnedto bidder. Each proposal shall be made on the official bid proposal form prepared for this purpose, whichmay be obtained from the Architect. Any alteration in the official bid proposal form will entitle theBoard of Supervisors at its option to reject the proposal involved from consideration. Eachproposal shall be accompanied by a bid bond or a certified check or cashier's check, drawn ona solvent state or national bank, or a certified share draft drawn on a credit union in Iowa, andfiled in a sealed envelope separate from the one containing the proposal. The bidders certifiedcheck or bid bond shall be in an amount equal to five percent (5%) of the amount of theproposal, made payable to the Story County, Iowa. The check may be cashed by the Board ofSupervisors or the bid bond forfeited to the Board of Supervisors as liquidated damages in theevent the successful bidder fails to enter into a contract and file acceptable bonds satisfactoryto the Board of Supervisors assuring the faithful fulfillment of the contract and maintenance ofsaid improvements as required by law within 10 days after the acceptance of the successful bidder's proposal The Board of Supervisors reserves the right to reject any or all proposals, or to defer action onthe proposals for a period of not to exceed 30 days from and after the date and time specifiedin this notice for receiving proposals. The successful bidder will be required to furnish a Performance Bond and a Payment Bond, each in an amount equal to 100 percent of the contract price. Said bonds are to be issued by aresponsible Surety approved by the Board of Supervisors and shall guarantee that the Principal will promptly make payment to all persons, firms, subcontractors and corporations furnishingmaterials for or performing labor in the prosecution of the work stated and the faithful performance of the contract and the terms and conditions therein contained and the guaranteethat all work performed and materials furnished shall be free from defects for a period of one (1)year from the time of acceptance of said improvements by the Board of Supervisors. Payment to the Contractor for said improvements will be made in monthly increments based onthe estimated progress of the Contractor in performing the contract. Payment will be made fromcash on hand and from such other funds as are available to the Board of Supervisors that maybe legally used for such purpose. At least 10 days before each progress payment falls due (but not more often than once amonth), the Contractor will submit to the Architect a partial payment estimate filled out andsigned by the Contractor covering the work performed during the period covered by the partial payment estimate and supported by such data as the Architect may reasonably require. If payment is required on the basis of materials and equipment not incorporated in the work butdelivered and suitably stored at or near the site, the partial payment estimate shall also be accompanied by such supporting data, satisfactory to the Board of Supervisors, as will establish the Board of Supervisors' title to the material and equipment and protect the Board ofSupervisors' interest therein, including applicable insurance. The Architect will, within 10 daysafter receipt of each partial payment estimate, either indicate in writing approval of payment and present the partial payment estimate to the Board of Supervisors, or return the partial payment estimate to the Contractor indicating in writing the reasons for refusing to approvepayment. In the latter case, the Contractor may make the necessary corrections and resubmitthe partial payment estimate. The Board of Supervisors will, within 10 days of presentation tothe Board of Supervisors of an approved partial payment estimate, pay the Contractor aprogress payment on the basis of the approved partial payment estimate Work under the proposed contract shall be commenced immediately after the award of thecontract and shall be completed and ready for operation not later than 365 calendar days afterthe notice to proceed, subject to any extension of time which may be granted by the Board ofSupervisors.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents