Similar Projects
30th St And Kessler Blvd Area Drainage Improvements
Design
$3,600,000 est. value
Indianapolis, IN 46222

Broadway & Rosebay Drainage Improvements
Infrastructure
Bidding
$1,300,000 to $1,800,000 est. value
Indianapolis, IN

Bee Slough River Floodgate Project
Infrastructure
Bidding
$2,618,994 est. value
Evansville, IN

48" Precast Reinforced Concrete Pipe
Post-Bid
Indianapolis, IN 46077

Culvert Pipe, Metal and Plastic
Post-Bid
Connersville, IN

Polymer Precoated Corrugated Steel Pipe and Couplings
Results
Indianapolis, IN 46077

2020 Addison Street Drainage Improvements
Renovation
Results
Crown Point, IN 46307

Springfield Road Culvert Replacement
Construction
Mount Vernon, IN

2021 Beaver Dam Ditch Lateral No. 5 Culvert Replacement Bike/Pedestrian Trail
Infrastructure
Bidding
Crown Point, IN 46307

Culvert Replacement
Post-Bid
Greenfield, IN

Greenfield Avenue Culvert Over Lehr Ditch
Results
Noblesville, IN 46060

Lake Lemon Sediment Improvement
Post-Bid
$1,500,000 to $2,000,000 est. value
Unionville, IN

Steel Sheet Piling
Results
Indianapolis, IN 46077

Drainage Structures 2021
Post-Bid
Paoli, IN

Lawrence Trades District Drainage Improvements
Results
$1,200,000 to $1,400,000 est. value
Indianapolis, IN

Reported 10/02/2021 12:00 AM
Project Title

Kankakee River Phase 4 Area 9

Physical Address View project details and contacts
City, State (County) Rensselaer, IN   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 4 Area 9 maintenance will consist of site preparation including tree removal, burning and burying of woody debris. Also, bank restoration along the Kankakee River consisting of placement of approximately 2,500 tons of clean clay rock fill, 5,000 tons of clean sand fill, and 1,883.15 tons of limestone rip rap. This material is meant to restore a safe twenty-five foot (25’) top to the riverbank and repair Jasper County's maintenance path improvement.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents