Similar Projects
Last Updated | 09/10/2020 10:27 AM |
Project Title | Depot Road Pump Station Improvements - General/Mechanical |
Physical Address | View project details and contacts |
City, State (County) | Erie, PA 16507 (Erie County) |
Category(s) | Sewer and Water, Single Trades |
Sub-Category(s) | Lift and Pump Stations, Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. All general, mechanical, and electrical construction and equipment installation required to facilitate the operation of the proposed construction. 2. All temporary construction measures required to facilitate the construction and operation of the proposed equipment. 3. All necessary demolition required to accommodate the installation of new facilities. 4. Replacement of one existing pump with new horizontal split case pump. 5.Installation of the following building modifications: 1. Demolition identified on the Contract drawings. 2. Installation of new horizontal split case pump, valves, pipe and fittings, all appurtenances thereto. 1. This section covers furnishing, installing and testing of all piping, tubing, fittings, valves, insulation, accessories and supports, etc. 2. Where piping connects to equipment, particular care shall be taken to see that pipe fittings are suitable for connection to the equipment fittings. 3. All piping shall be erected true to line and grade by skilled mechanics in strict accordance with the Plans, Specifications and approved Drawings. 4. Where walls and piping systems are parallel to one another, the piping shall be grouped or arranged to present a symmetrical appearance. 5. All piping connections to pumps and other equipment shall be made in such a manner as to avoid any strain being transmitted from the piping to the equipment. Flanged piping shall be carefully installed so that the pipe flanges exactly match and are perfectly parallel to the flanged equipment connections. 6. All piping connections to pumps and other equipment shall be made in such a manner as to avoid any strain being transmitted from the piping to the equipment. Flanged piping shall be carefully installed so that the pipe flanges exactly match and are perfectly parallel to the flanged equipment connections. 7. All piping shall run parallel with the building walls unless otherwise indicated. Diagonal runs will not be permitted. In all walkways, stair and working platform areas, a minimum clearance of 6'- 8" from the floor, stair, or platform to the lowest point of the piping or piping accessory shall be maintained. 8. The CONTRACTOR shall be cognizant of the service and design features such as, supports, anchoring, expansion/ contraction and jointing of the piping and valves he proposes to utilize. He shall inform the OWNER of any features which are not compatible with the Drawings at the time such equipment is submitted for approval. 9. All pipe nipples shall be of the same material as the line in which they are installed. Location of Work: corner of Franz Avenue and Depot Road in Harborcreek, PA 16421. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |