Similar Projects
Richard S. Wasielewski WTP Fluoridation Facility - General/Mechanical
Bidding
$450,000 est. value
Erie, PA 16507

Modernization of a Traction Elevator and Related Building Interface Work - Mechanical Construction (Plumbing and HVAC)
Bidding
Erie, PA 16501

Boiler Replacement at Curry/Schell Apartments
Post-Bid
Erie, PA 16508

Ranges, Refrigerators and Hot Water Heaters
Post-Bid
Erie, PA 16501

Sewer Pump Station No. 2 Improvement Project
Results
Corry, PA 16407

J--Condensate Line Replacement
Results
Erie, PA 16504

Eastwood Pump Station Elimination Project
Post-Bid
North East, PA 16428

Cherry Street Pumping Station - General/Mechanical
Results
$8,000,000 est. value
Erie, PA 16507

Gas Boiler Replacements
Post-Bid
Corry, PA 16407

Municipal Garage Improvements - (Mechanical)
Results
$95,000 to $115,000 est. value
Erie, PA 16509

H245--Boiler Safety Device Testing
Post-Bid
Coatesville, Erie, PA 19320

Taylor Pump Station Comminutor Replacement Project
Results
Harborcreek, PA 16421

H245--Boiler Safety Device Testing
Post-Bid
Wilmington, DE - Altoona, Coatesville, Erie, PA

Shoreline Pump Station
Results
Erie, PA 16500

Contract 2 General Construction - 6 Mile Creek Pump Station Replacement and Equalization Tank Projects
Results
Harborcreek, PA

Last Updated 09/10/2020 10:27 AM
Project Title

Depot Road Pump Station Improvements - General/Mechanical

Physical Address View project details and contacts
City, State (County) Erie, PA 16507   (Erie County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Lift and Pump Stations, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. All general, mechanical, and electrical construction and equipment installation required to facilitate the operation of the proposed construction. 2. All temporary construction measures required to facilitate the construction and operation of the proposed equipment. 3. All necessary demolition required to accommodate the installation of new facilities. 4. Replacement of one existing pump with new horizontal split case pump. 5.Installation of the following building modifications: 1. Demolition identified on the Contract drawings. 2. Installation of new horizontal split case pump, valves, pipe and fittings, all appurtenances thereto. 1. This section covers furnishing, installing and testing of all piping, tubing, fittings, valves, insulation, accessories and supports, etc. 2. Where piping connects to equipment, particular care shall be taken to see that pipe fittings are suitable for connection to the equipment fittings. 3. All piping shall be erected true to line and grade by skilled mechanics in strict accordance with the Plans, Specifications and approved Drawings. 4. Where walls and piping systems are parallel to one another, the piping shall be grouped or arranged to present a symmetrical appearance. 5. All piping connections to pumps and other equipment shall be made in such a manner as to avoid any strain being transmitted from the piping to the equipment. Flanged piping shall be carefully installed so that the pipe flanges exactly match and are perfectly parallel to the flanged equipment connections. 6. All piping connections to pumps and other equipment shall be made in such a manner as to avoid any strain being transmitted from the piping to the equipment. Flanged piping shall be carefully installed so that the pipe flanges exactly match and are perfectly parallel to the flanged equipment connections. 7. All piping shall run parallel with the building walls unless otherwise indicated. Diagonal runs will not be permitted. In all walkways, stair and working platform areas, a minimum clearance of 6'- 8" from the floor, stair, or platform to the lowest point of the piping or piping accessory shall be maintained. 8. The CONTRACTOR shall be cognizant of the service and design features such as, supports, anchoring, expansion/ contraction and jointing of the piping and valves he proposes to utilize. He shall inform the OWNER of any features which are not compatible with the Drawings at the time such equipment is submitted for approval. 9. All pipe nipples shall be of the same material as the line in which they are installed. Location of Work: corner of Franz Avenue and Depot Road in Harborcreek, PA 16421.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents