Similar Projects
Last Updated | 02/17/2023 11:33 PM |
Project Title | CSO 513 Partial Sewer Separation - Rebid |
Physical Address | View project details and contacts |
City, State (County) | Reading, OH 45215 (Hamilton County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $6,728,010 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 15 2022 there is an awarded bidder. ACC. NO. 78351 The project is intended to reduce combined sewer overflows as CSO 513 by diverting stormwater to a total of approximately 7100 linear feet (LF) of storm sewer in various diameters, 48 manholes, several catch basins and other inlets, two stormwater outfalls, and other sewer appurtenances in two separate alignments. In addition to storm sewer installation, the project will include asphalt and concrete pavement and removal, management of contaminated soils, removal and/or abandonment of existing sewer lines, and relocation of existing utilities. This project is in the City of Reading, Hamilton County, Ohio 45215 The estimated cost of construction for this project is: $7,640,100.00 Questions on this project or any part of the contract documents and other project documents Must be sent via e-mail to msd.Procurement@cincinnati-oh.Gov by the established Deadline. The deadline for questions is 12:00 pm local time on wednesday, june 15, 2022. The established SBE Participation Goal for this project is: 6%. Bidder is required to complete and submit the SBE Goal Compliance Plan Cover Page with bid. If the SBE goal will not be met, the bidder shall also complete and submit the Waiver Request Form and Affidavit, and the SBE Subcontractors Good Faith Efforts (GFE) Summary Sheets with the bid. To be eligible for award of a contract or procurement when the SBE goals will not be met, the bidder must complete all SBE Subcontractors GFE Summary Sheets to support the Waiver Request Form and Affidavit areas checked. Failure to complete and submit required documentation may cause a bid to be rejected as non-responsive. Bids must be submitted in accordance with the Contract Documents and must be accompanied by the Bid Guaranty and Contract Bond, certified check, or letter of credit drawn on a solvent bank in an amount not less than ten percent (10%) of the bid amount, and in no event shall be less than five hundred dollars ($500.00). Bidder shall also submit a completed Addenda Acknowledgment Form with the bid. In addition to other documents, after the Bid Opening and upon notification, the apparent lowest and best bidder will need to obtain proof of Workers Compensation coverage and a certificate of insurance within ten (10) business days, naming the City as the primary insured and the Hamilton County, Ohio Board of County Commissioners as an additional insured. See the Contract Documents, including but not limited to the Modified General Conditions, for further certificate of insurance requirements and limits of liability. The Date for Substantial Completion of the Contractor Work will be 500 days after the Date For Commencement. The Date for Final Completion of the Contractor Work will be 90 days after the Date For Substantial Completion. The Date for Final Completion shall only be changed or modified by Change Order, other Modification, or a Claim that is Finally Resolved regardless of any dates in any schedules, including the Construction Progress Schedule, created by any person, including the Contractor. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |