Similar Projects
Relocatable classroom building in summer/fall 2023
Renovation
Design
$1,000,000 CJ est. value
Irvine, CA 92606

St. Mary's School International Baccalaureate (IB) World School
Demolition, New Construction, Infrastructure - 28,000 SF
Design
$8,000,000 CJ est. value
Aliso Viejo, CA 92656

Paul Revere MPR Building Complex and Parking Lot
Demolition, New Construction, Infrastructure
Bidding
$8,273,000 CJ est. value
Anaheim, CA 92805

Paul Revere MPR Building Complex and Parking Lot
Demolition, New Construction, Infrastructure
Bidding
$8,273,000 CJ est. value
Anaheim, CA 92805

Measure E Series 3 - Expansion Projects at Greentree ES & Santiago Hills ES Rebid
Addition, Demolition, Infrastructure
Sub-Bidding
$17,191,154 CJ est. value
East Irvine, CA 92650

Measure E Series 3 - Expansion Projects at Greentree ES & Santiago Hills ES Rebid
Addition, Demolition, Infrastructure
Sub-Bidding
$17,191,154 CJ est. value
East Irvine, CA 92650

Construction Management Services
New Construction
Post-Bid
Anaheim, CA

Lathrop Restroom Building and Parking Lot Expansion
Infrastructure, Renovation
Post-Bid
$400,000 CJ est. value
Santa Ana, CA 92707

Ambuehl Elementary School Modernization
Renovation
Results
$2,500,000 est. value
San Juan Capistrano, CA 92675

Star View ES Modernization
Renovation
Results
$26,219,127 CJ est. value
Midway City, CA 92655

Portable Building Relocation Project
Renovation
Construction
$1,450,000 CJ est. value
Tustin, CA 92780

Benito Juarez MPR Building Complex and Library Modernization
Demolition, New Construction, Build-out, Renovation, Infrastructure
Bidding
$10,756,000 CJ est. value
Anaheim, CA 92805

Restroom Renovation at Multiple Sites
Renovation
Post-Bid
$500,000 CJ est. value
Orange, CA 92866

Restroom Renovations at Multiple Sites Phase 2
Renovation
Results
$3,490,058 CJ est. value
Orange, CA 92866

Willard IS CTE Relocation Project & Valley HS NAC Relocation Project
Renovation
Bidding
$2,000,000 CJ est. value
Santa Ana, CA 92701

Last Updated 10/16/2023 04:10 PM
Project Title

Measure E Series 3 - Interior Improvement Projects at Greentree ES & Santiago Hills ES

Physical Address View project details and contacts
City, State (County) Irvine, CA 92606   (Orange County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

PREQUALIFICATION QUESTIONNAIRE PACKAGE DEADLINE: 2:00 p.m. of the 3rd day of October 2023 30-48 Any contractor that has prequalified with the District in accordance with Public Contract Code section 20111.6 within the past twelve (12) months may satisfy the prequalification requirements for this project if its earlier Prequalification Questionnaire package was approved for the same or appropriate license requirement, and the contractors total base bid and alternates amount for this Project does not exceed their prequalified bid amount which is equal to fifty percent (50%) of the contractors bonding capacity. Bidders are solely responsible to verify with the DISTRICT whether they are properly prequalified to submit a bid for this Project. Since this Project includes work that will be performed by mechanical, electrical, or plumbing (MEP) contractors (contractors that require C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C42, C-43 or C-46 licenses), such MEP subcontractors must also be prequalified. A list of prequalified MEP subcontractors will be made available by the DISTRICT to all bidders at least five business days prior to the bid opening date. If a Contractor has been prequalified, they are discouraged from renewing their prequalification status between October 5, 2023 and October 12, 2023. An attempt to renew during this period, will remove the Contractor from the approved list of prequalified Contractors. A Contractors bid for the Measure E Series 3 - Interior Improvement Projects at Greentree ES & Santiago Hills ES Project WILL NOT be accepted unless the Contractor is properly prequalified. If any bidder is in doubt as to the true meaning of any part of the Project Documents, finds discrepancies in or omissions from the Project Documents, or requests a substitution for materials and equipment as outlined in the specifications, they must submit a written request for an interpretation or correction to C.W. Driver on or before October 4th, 2023 by 2:00 p.m. No requests shall be considered after this time. Each bid shall be accompanied by a bid security in the form of cash, a certified or cashier's check or bid bond in an amount not-less-than ten percent (10%) of the total bid price, payable to the DISTRICT. The DISTRICT reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents