Similar Projects
Hot Water Dual Boiler Heating System at the Como Park Hoof Stock Barn
Alteration
Bidding
Saint Paul, MN 55103

Boiler Maintenance Services
Term Contract
Bidding
MN

OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Nicollet Public Schools Mechanical Equipment - Supply
Post-Bid
Mankato, MN

Steam Boiler Replacement at MCF Red Wing
Results
Less than $1,963,759 est. value
Red Wing, MN 55066

JFK Elementary School 2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Metro and Seneca Incinerator Refractory Repair
Term Contract, Alteration
Bidding
Eagan, Saint Paul, Shakopee, MN 55106

Chiller Maintenance
Post-Bid
Minneapolis, MN

2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Franklin O and M Facility Geothermal Systems Modifications
Alteration
Bidding
Minneapolis, MN

Boiler Services
Term Contract
Post-Bid
Moorhead, MN

Owatonna 2021 Multi-site Mechanical Upgrades
Results
$900,000 est. value
Owatonna, MN 55060

Boiler and Chiller Replacement
Post-Bid
Woodbury, MN 55125

Valley View Elementary School Boiler Plant
Results
Columbia Heights, MN 55421

Furnace Upgrades & Air Quality Improvements
Post-Bid
Crookston, MN 56716

Last Updated 10/11/2021 07:48 AM
Project Title

Boiler Replacement

Physical Address View project details and contacts
City, State (County) Faribault, MN   (Rice County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000 to $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1) Remove two existing low-pressure steam boilers and associated steam components and replace them with two new high-efficiency hot water boilers and all required hydronic accessories. 2) Remove remaining steam and condensate piping distribution system and install new hydronic piping distribution system and required accessories to serve the HVAC equipment that was previously served by the steam system. 3) Modify seven (7) existing air handling units to replace the existing steam heating coils with new hot water coils. 4) Remove five (5) existing steam propeller unit heaters and replace them with seven (7) new hot water unit heaters. 5) Modify the existing building automation system (BAS) as required to accommodate new boilers, AHU modifications and new terminal heating equipment. 6) Remove three (3) existing shop wash fountains and replace them with new wash fountains. 7) Under and alternate bid, remove the existing fuel oil storage tank and provide necessary restoration and paving repairs. 8) Under and alternate bid, provide additional modifications to six (6) air handling units and BAS controls to reposition heating and cooling coils to allow implementation of a dehumidification sequence.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents