Similar Projects
Caseys General Store / Evansville
New Construction, Infrastructure
Conception
$1,350,000 CJ est. value
Evansville, IN 47708

Site Plan - South Weinbach Avenue & Lincoln Avenue / Mixed Use - University of Evansville
New Construction, Infrastructure - 3,500 SF
Design
$959,000 CJ est. value
Evansville, IN 47714

MJM Warehouse / Evansville
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Evansville, IN 47715

Pedestrian Bridge Construction
New Construction, Infrastructure
Bidding
$2,080,500 CJ est. value
Evansville, IN 47714

Heartland Dental / Evansville
New Construction, Infrastructure - 4,248 SF
Bidding
$2,000,000 CJ est. value
Evansville, IN 47715

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Preventative Maintenance for and Fire Sprinkler and Standpipe System and Fire Hydrants
Infrastructure
Post-Bid
Evansville, IN 47714

Charlotte Avenue /Russell Avenue Water Main Replacement
Infrastructure
Results
$645,136 est. value
Evansville, IN 47720

Cedar Hall Exterior Painting and Site Improvement
Infrastructure, Alteration
Results
Evansville, IN 47713

Baker Flat / Evansville
New Construction, Infrastructure
Construction
$11,000,000 CJ est. value
Evansville, IN 47710

2022 Mill and Overlay - Phase II
Infrastructure
Construction
$1,097,983 CJ est. value
Evansville, IN 47708

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

Sunoco - Weinbach Avenue / Evansville
Demolition, New Construction, Infrastructure - 3,969 SF
Pending Verification
$1,000,000 CJ est. value
Evansville, IN 47714

CenterPoint Energy Power Facility / Evansville
Addition, Demolition, Build-out, Infrastructure
Design
$2,000,000 CJ est. value
Evansville, IN 47714

Street Maintenance Department (SMD) Facility Relocation Bid Group #1 - Pre-Engineered Building
Demolition, New Construction, Infrastructure - 74,400 SF
Post-Bid
$500,000 CJ est. value
Evansville, IN 47708

Last Updated 04/21/2023 09:07 AM
Project Title

2022 Annual Sewer Lining - Hitch and Peters Road

Physical Address View project details and contacts
City, State (County) Evansville, IN 47708   (Vanderburgh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $846,828 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Any bids received later than the above time and date will be returned unopened. No conditional bids will be considered. The work for which bids are to be received consists of: The 2022 Annual Sewer Lining - Hitch and Peters Road project consists of the C.I.P.P. lining of approximately 1,904 linear feet of 15" diameter sanitary sewer main, 1,120 linear feet of 18" diameter sanitary sewer main, and 1,879 linear feet of 21" sanitary sewer main. This work shall also include the replacement of approximately 12 vertical feet of 48" diameter sanitary sewer manhole, the rehabilitation of approximately fourteen (14) sanitary sewer manholes, and the reinstatement of approximately fifteen (15) laterals. This shall include all the necessary work associated with C.I.P.P. lining, including but not limited to bypass pumps and bypass piping. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work shown in the Drawings and Specifications. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications. The above referenced project description includes items that are part of the Itemized Base Bid. The Contractor shall be responsible for all work shown on the plans and described in the specifications pertaining to the Itemized Base Bid, regardless of the installation method chosen. The Evansville Water and Sewer Utility further reserves the right to waive informalities, and to award the contract to the lowest and most responsible bidder (or bidders), all to the advantage of the Evansville Water and Sewer Utility, or to reject all Proposals. SCOPE The 2022 Annual Sewer Lining - Hitch and Peters Road project consists of the C.I.P.P. lining of approximately 1,904 linear feet of 15" diameter sanitary sewer main, 1,120 linear feet of 18" diameter sanitary sewer main, and 1,879 linear feet of 21" sanitary sewer main. This work shall also include the replacement of approximately 12 vertical feet of 48" diameter sanitary sewer manhole, the rehabilitation of approximately fourteen (14) sanitary sewer manholes, and the reinstatement of approximately fifteen (15) laterals. This shall include all the necessary wor associated with C.I.P.P. lining, including but not limited to bypass pumps and bypass piping. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents