Similar Projects
20th Street Culvert Replacement
Infrastructure
Bidding
$3,000,000 CJ est. value
Sault Sainte Marie, MI 49783

Hot Mix Asphalt Crush, Shape and Resurface With Hot Mix Asphalt Curb and Pavement Markings on Kallio Road
Infrastructure
Bidding
$577,000 CJ est. value
Kinross Charter Township, MI 49780

Demolition and Disposal ofExisting Rooms, and Remodel ofTwo (2) Cisler Center Guest Rooms, with Option of Splitting the Existing Two (2) Rooms into Three (3) Guest Rooms
Demolition, Build-out, Infrastructure
Post-Bid
$24,688 CJ est. value
Sault Sainte Marie, MI 49783

Norris Bell Tower, and The Purchase & Installation of two (2)35 foot Flag Poles
Infrastructure
Post-Bid
$22,000 CJ est. value
Sault Sainte Marie, MI 49783

Chippewa Cty Manufacturing Building and Rail Spur EXP Kincheloe MI - All Trades
New Construction, Infrastructure - 20,000 SF
Results
$6,146,000 CJ est. value
Kinross Charter Township, MI 49788

Hot Mix Asphalt Reconstruction, Concrete Sidewalk and Ramps, Sanitary and Storm Sewer, Watermain and Pavement Markings on Meridian Street
Infrastructure
Results
$4,726,306 CJ est. value
Sault Sainte Marie, MI 49783

St. Mary's River Soo Locks (Major Rehabilitation) - US Army Corps of Engineers
Infrastructure
Pending Verification
$37,300,000 CJ est. value
Sault Sainte Marie, MI 49783

St. Mary's River Soo Locks (Major Rehabilitation) - US Army Corps of Engineers
Infrastructure
Pending Verification
$37,300,000 CJ est. value
Sault Sainte Marie, MI 49783

20 Mile Rd forest Road- Improvements
Infrastructure
Bidding
$1,200,000 CJ est. value
Pickford, MI 49774

Residential Housing Site Improvements Phase IV
Infrastructure, Renovation
Post-Bid
$1,500,000 CJ est. value
Sault Sainte Marie, MI 49783

Veterans Park Pavilion
New Construction, Infrastructure - 4,000 SF
Results
$425,000 CJ est. value
De Tour Village, MI 49725

Bay Mills Casino and Resort Expansion
Addition, Demolition, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Brimley, MI 49715

RFP D/B - Design and Build a New Garage at the Center for Freshwater Research and Education (CFRE)
New Construction, Infrastructure - 1,500 SF
Post-Bid
$80,000 CJ est. value
Sault Sainte Marie, MI 49783

Chippewa County International Airport - Rehabilitate Taxiway A
Infrastructure
Pending Verification
$1,054,039 CJ est. value
Kinross Charter Township, MI 49788

Playground Rehabilitation Projects for 2 Playgrounds (Sault Ste Marie Housing Site and Odenaang Housing Site)
Infrastructure
Post-Bid
$300,000 CJ est. value
Sault Sainte Marie, MI 49783

Last Updated 04/28/2023 03:09 PM
Project Title

New Lock at the Soo, New Third Lock

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI 49783   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction Commenced, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,300,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: demolition of an existing lock chamber and construction of a new 110’ x 1200’ lock chamber including all operating machinery and auxiliary structures. Subcontracting opportunities exist in the areas of: Electrical systems, mechanical systems, hydraulic structures fabrication, structural steel fabrication, pre-engineered metal buildings, miscellaneous metals fabrication, commissioning, testing, piping systems, painting, architectural systems, drilling, grouting, and dewatering. This contract will contain a base bid item and seven optional contract line items (CLINS). The major components of the base include mobilization, batch plant set-up, cofferdam construction, relocations, care and diversion of water necessary to get the area to a dewatered state; construction of a New Power Plant Bridge; construction of a new shaft, Shaft 6; installation of Struts to stabilize the existing Lock walls; demolition of the existing Sabin Lock; excavation of rock and placement of a mud mat; construction of the Wide Wall Monoliths; fabrication and installation of the Upstream Ship Arrestors; fabricate, deliver, and install metals including miter gates and culvert valves; construction of phase one of the New Pump Well (including the demolition of the existing Davis Lock floor, rock excavation, , and construction of concrete structure to the operating floor). Option 1 includes the construction of the majority of Chamber Wall Monoliths, including the installation of embedded and post installed metals. Option 2 include the completion of the New Pump Well, including installation of all equipment, construction of the operating building, and rehabilitation of existing Davis and Poe pump wells. Option 3 includes the installation of air, steam, power, and hydraulic piping; commissioning and testing the miter gates, culvert valves, and Upstream Ship Arrestors; finalizing the site work; constructing the Lock Floor; and removal of the coffer cells. Option 4 includes installing solider pile and lagging, tie-back system, concrete cap, electrical infrastructure and bollards on the Downstream Approach Wall and East Center Pier. Option 5 is the installation of the Hands-Free Mooring system consisting of total of seven units on the North and South Walls including installation of dynamic units, cabling, equipment, associated software. Option 6 is the fabrication, installation, testing and commissioning of the Downstream Ship Arrestors. Option 7 includes excavation of rock and construction of a hybrid wall for the Alligator's Mouth expansion of the mooring area. The anticipated duration for the base is 1642 calendar days after the notice to proceed, an additional 365 calendar days will be provided if Option 1 is exercised and an additional 365 days will be provided if Option 3 is exercised. The Government intends to exercise all options. Options 4, 5, 6, and 7 are the last options to be exercised, and may be exercised as late as 1287 calendar days after the notice to proceed. As of April 19, 2023, this project has been awarded to a Joint Venture Construction Management Team. Minor mobilization and related minor construction are underway, but the actual start of construction is not anticipated until second quarter 2023. The earliest that winter thaw will allow construction is spring 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents