Similar Projects
Pipe Procurement - Interceptor 8253-327 Phase 1
Term Contract
Sub-Bidding
$500,000 CJ est. value
Saint Paul, MN 55107

Pipe and Equipment Insulation Services
Alteration
Post-Bid
Mankato, MN

PW-Install Pipe Insulation on Eyewash/Shower Stations
Alteration
Post-Bid
$300,000 est. value
Minneapolis, MN

Goodview Avenue Water Main Extension
Infrastructure
Results
$2,270,208 CJ est. value
Cottage Grove, MN 55016

Palmer Creek Estates Stream Restoration
Infrastructure
Results
$558,098 CJ est. value
Plymouth, MN 55442

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Plumbing and HVAC Temporary
Alteration
Post-Bid
$600,000 est. value
Saint Paul, MN 55116

Stillwater Downtown Manhole Rehabilitation Project
Infrastructure
Results
$145,000 CJ est. value
Stillwater, MN 55082

Riverview Heights Highrise Plumbing Upgrades
Renovation
Post-Bid
$717,000 CJ est. value
Moorhead, MN 56560

Lac Qui Parle WMA- Killen Unit Moist Soil Unit Drain Tile and Bypass
Infrastructure
Results
$294,998 CJ est. value
Appleton, MN 56208

2022 Sanitary Sewer Collection Improvements
Demolition, New Construction, Infrastructure
Post-Bid
$3,149,154 CJ est. value
Winger, MN 56592

Sunrise River Highway 61 Wetland Enhancement
Infrastructure
Results
$1,323,248 CJ est. value
Columbus, MN 55025

Plumbing Work for Bathroom Renovation
Renovation
Post-Bid
$600,000 CJ est. value
Cambridge, MN 55008

Judicial Ditch No. 42 Bid Package 1
Infrastructure
Results
$964,931 CJ est. value
Windom, MN 56101

Vanity/Sink Replacement
Renovation
Post-Bid
$540,000 CJ est. value
Cambridge, MN 55008

Preliminary Treatment Building Upgrades
Renovation
Results
$2,560,350 CJ est. value
Winona, MN 55987

Last Updated 10/10/2023 03:23 PM
Project Title

Ecology Building Correct Water Leaks

Physical Address View project details and contacts
City, State (County) Falcon Heights, MN 55108   (Ramsey County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,392,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Services for correction of water leaks at the Ecology Building, located on the St. Paul campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. The University is aware that the Project may run into unfavorable weather. The Project can be split into 2 phases to be Substantially completed in Spring April - May 2024 with the first phase in Fall of 2023. Anticipated Authorization to Proceed October 23, 2023 Anticipated Authorization to Proceed October 23, 2023 Question Deadline 09/26/2023 at 12:00 PM CT All other prevailing wage violations and questions should be sent to: Department of Labor and Industry Prevailing Wage Section 443 Lafayette Road N St Paul, MN 55155 (651) 284-5091 DLI.PrevWage@state.mn.us Building and McNeal Hall. This includes the west stair tower as well as the tunnel between Ecology Building and Borlaug Hall, and the east stair tower. The University is seeking the services of a qualified Contractor, and water infiltration expert, to carry out the full scope repair and water infiltration remediation as outlined in details in the Construction Documents. The Contractor will provide labor, materials, and incidentals to fulfill Construction Documents scope as well as the scope Alternates. Respondents shall bid to the best of their abilities and capabilities regarding the Project schedule. Miller Dunwiddie Architecture is the Architect/Engineer of Record for the Project.

Details

7 Stories Above Grade, 100,100 SF.
Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents