Similar Projects
John M. Price District Attorney Building - Replace Carpet Throughout Facility - P000176 - Sacramento County
Alteration
Conception
$868,000 est. value
Sacramento, CA 95814

Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Bakersfield High School Warren Hall Modernization Descope Phase 1
Renovation, Infrastructure
Sub-Bidding
$164,000 CJ est. value
Bakersfield, CA 93304

Presidio of Monterey - VCT Floor Tile Building #650
Renovation
Sub-Bidding
$500,000 CJ est. value
Monterey, CA 93944

Carpet Replacement
Alteration
Post-Bid
Bishop, CA 93514

Bny Mellon Club Engineered Wood Refinishing
Alteration
Post-Bid
Santa Clara, CA 95054

Oak Park Dance Floor Repair
Alteration
Results
$93,000 est. value
Santa Barbara, CA 93102

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

Roller Hockey Rink Floor Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Torrance, CA 90501

Flooring Repair and Installation Services
Alteration
Post-Bid
Roseville, CA

Flooring for Desert Housing
Term Contract
Results
CA

FEMA Region 9 Floor Core Services
Alteration
Post-Bid
Oakland, CA 94607

Gym Floor Refinishing
Term Contract, Alteration
Results
$100,000 est. value
Fremont, CA

Gym Lobby Flooring
Alteration
Post-Bid
San Bernardino, CA 92408

Flooring - Nichols and Foussat Elementary Schools
Alteration
Results
$200,000 est. value
Oceanside, CA 92057

Last Updated 06/20/2023 10:37 AM
Project Title

Flooring Replacement Projects Phase 1

Physical Address View project details and contacts
City, State (County) San Mateo, CA 94403   (San Mateo County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $396,800 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As per specified locations and construction specifications provided by the District, the project consists of all labor, materials, equipment and services necessary to complete the following scope: Abatement of areas as required (See report - Scope description) Demo and remove the existing carpet, VCT/LVT and wall base Furnish and Install specified moisture barrier system and provide proper floor preparation for all existing concrete subfloor areas receiving new flooring Furnish and Install new specified entry walk off carpet tile, resilient plank flooring, resilient sheet flooring, top set coved wall base and all related sundries and accessories. Time for Completion: It is hereby understood and agreed that the Contractor shall complete the Work by Monday July 31st, 2023 ("Contract Time") from the date specified in the District's Notice to Proceed a cashier's check or a certified check, drawn to the order of the San Mateo-Foster City School District in the amount of ten percent (10%) of the total bid price he successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. Question Deadline 04/07/2023 at 4:00 PM PT All pre-qualification questionnaires will be received, through Quality Bidders using their web online

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents