Similar Projects
Last Updated 05/14/2022 03:45 AM
Project Title

Asphaltic Concrete Paving Projects

Physical Address View project details and contacts
City, State (County) Milwaukee, WI   (Milwaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a civil project in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway. Construction Variable Thickness Asphaltic Concrete Pavement, 7" Concrete Pavement, Variable Thickness Concrete Base, 6" Concrete Base, 7" Concrete Driveways, Sealing Pavement Joints and Cracks, Pavement Grinding/milling, Concrete Curb and Gutter, 5" Concrete Walk, Detectable Warning Field, Concrete Removals, Pavement Marking, Sewer Work, Water Work, Cuc, Trees Clearing and Grubbing, Etc.; Liquidated Damages, per diem: $1000.00/Day The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's The apprenticeship requirements for this project is: 0. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. THE EMAILED COPY OF THE BOND MUST BE RECEIVED BY NO LATER THAN 10:30 A.M. ON THE SAME DATE THAT THE BIDS ARE DUE FOR THAT SPECIFIC OFFICIAL NOTICE, or the bid will be considered non-responsive. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office inperson or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, immediately upon being notified that they are the apparent low bidder. Time for Completion: All work on project ST211060144 - North 23 rd Street, West Keefe Avenue to West Vienna Avenue shall be completed by August 26, 2022. No work can start at this location until after June 15, 2022. All work on project ST211150128 - West Concordia Avenue - North 20 th Street to North 22 nd Street - all work shall be completed by September 16, 2022. PAYROLL MONITORING REQUIREMENTS: The Prime Contractor awarded this project is required to participate in training on the City of Milwaukee's LCP Tracker Labor Compliance Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCP Tracker. Please contact the DPW Contracts Office at 414-286- 3314 should you have any questions or concerns regarding the training or reporting process.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents