Similar Projects
Clearwater Ceramics Center
Alteration
Bidding
Concord, NC

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

Blue Ridge Community College Spearman Building Boiler 1 Replacement
Post-Bid
Flat Rock, NC 28731

Ultrasoft Water Softener Unit
Results
Camp Lejeune, NC 28547

Z--Demo and Install Mechanical Room
Results
$25,000 to $100,000 est. value
Salisbury, NC 28144

Reverse Osmosis System for 30 Locations
Post-Bid
NC

Solicitation-Boiler Cleaning
Results
Jacksonville, NC

Trane Chiller CH530 Controller Replacement for USCG Base Elizabeth City
Post-Bid
Elizabeth City, NC 27909

Design, Installation and Maintenance of Carbon POE Systems on Residential Wells
Term Contract
Results
$100,000 est. value
Raleigh, NC

Removal and Installation of Cooler/Freezer Units at Two (2) Sites
Post-Bid
Newton, NC 28658

Cane Creek Middle School Water Heater Replacement 2020
Results
Less than $28,494 est. value
Fletcher, NC 28732

Mechanical Repairs Bldg RR400 (18-0041)
Post-Bid
$1,000,000 to $5,000,000 est. value
Camp Lejeune, NC 28547

Valley Springs Middle School Water Heater Replacement 2020
Results
Less than $31,969 est. value
Arden, NC 28704

OWASA Mason Farm Miscellaneous Mechanical Improvements
Post-Bid
$350,000 est. value
Chapel Hill, NC 27517

White Oak High School Boiler Stack Replacement
Results
Jacksonville, NC 28546

Last Updated 06/07/2021 11:33 AM
Project Title

Valley Springs Middle School Mechanical Upgrade

Physical Address View project details and contacts
City, State (County) Arden, NC 28704   (Buncombe County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of: 1. Removal of existing HVAC system and replace with new air conditioning system for the main building and gymnasium. The main system type will be dual temperature fan coil units with dedicated outside air. Secondary system types will include roof and pad mounted DX equipment. 2. Removal Of existing building automation and replace. 3. Project is divided into 5 phases per documents and bid with base and alternates listed in the project manual. Phase 1 begins in March 2021, completing with Phase 5 in August Of 2022. 4. Project will include associated electrical work and replacing ceiling grid. 5. All associated work to integrate existing HVAC equipment with the new BAS.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents