Similar Projects
Reported | 08/11/2020 12:00 AM |
Project Title | Fire Suppression System Inspection Services |
Physical Address | View project details and contacts |
City, State (County) | Butner, NC 27509 (Granville County) |
Category(s) | Professional Services |
Sub-Category(s) | Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contract shall consist of a 12-month base year and four 12 month option years. The following quantities listed are estimates for FCC Butner annual requirement; 61 Fire hydrants, 81 Wet systems, 5 pre action systems, 17 Dry systems. In addition, the following quantities listed are estimates of systems to be inspected for FCC Butner semi-annually requirement; 6 water mist systems (2 institutions/13 hoods), 14 ansul hood systems (3 institution/17 hoods) and 1 halon system. The contractor shall perform the following: inspect all wet fire sprinklers, risers, control valves, flow switches, tamper switches, gauges and related equipment. lnspecting of sprinkler systems and times record??r flow switches with adjustments for time delays as needed, main drain test performed with pressures recorded, visual inspection all exposed sprinklers and piping, check gauges for proper readings, flow test of hydrants. All inspections, testing and maintenance performed in accordance with NFPA standards and state and manufactures requirements for water based fire protections systems. In addition, all testing equipment used for the inspection process shall be provided by the contractor. The contractor shall be responsible for the provision of all equipment, labor, licenses, permits, maintenance, materials, parts tools, etc., necessary to carry out the requirements of this contract. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |